The Screen Print Column
Layout your worflow because of data, not instinct
You could very organised but if your sorting you workflow by instinct you’re already behind. Beppe Quaglia, founder and CEO of Virus Inks, explains six steps to re-organising your screen printing workshop today.
T
here always comes a point when you promise yourself you’ll finally sort out the workshop. But if your real goal is to optimise output and boost productivity, moving shelves around won’t get you there.
The uncomfortable truth is that most layouts are drawn up by eye, out of habit, or by copying something seen elsewhere – not based on real data about your own workflow. I have seen too many workshops reorganise their space starting from the owner’s gut feeling rather than from measurement. The result is almost always the same: the furniture moves, not the problem.
Measure before you move anything The Pareto principle – 80% of output comes from 20% of input – is quoted everywhere and applied almost nowhere. It isn’t enough to ask yourself, “what’s my main process?” by gut feel. Track the actual time spent on every stage for two weeks, from preparing the Stencil through to packing the finished garment. In most workshops, the real bottleneck isn’t the printing stage on the press – it’s something less visible: The waiting time for the flash cure between colours, or the frame changeover. Until you measure it, you’re re-organising based on a hunch, not a fact.
Account for the hidden cost of Screen changes This is an aspect rarely covered in general-interest articles: how much time and space you lose switching between a job in four-colour process (CMYK), one in simulated process, and a straightforward single-colour print. Every changeover means dismantling and remounting frames, cleaning the mesh, and often hunting for the right Frame among dozens of others. Set up a dedicated area where stencils are organised by client or by live job – not by production date – and you’ll cut dead time between orders significantly.
Design the layout for hybrid workflows Very few workshops today run on a single decoration method. Screen printing, DTF and sublimation co-exist in the same space, often on the same bench. This creates a concrete and underrated risk: Cross-contamination between substrates. A polyester garment destined for sublimation that gets in contact with plastisol ink residue meant for cotton can ruin an entire production run. It’s better to physically separate the areas dedicated to different substrates, even where space is tight: A simple partition or a different arrangement of workbenches prevents costly mistakes.
Treat maintenance as a layout variable Most guides talk about where to put your equipment, not where to put your spares. Yet productivity grinds to a halt just as easily
www.printwearandpromotion.co.uk
because of a faulty squeegee or a blade that needs replacing at the wrong moment.
Keep a set of spare squeegees and blades, together with the flood bar, within easy reach of the press – not in a storeroom at the far end of the workshop. The same goes for the coating trough: Position it near the pre-press area, not near the printing zone, to prevent emulsion from staining garments in the job currently being run.
Design in safety
This is the point that the typical motivational blog article almost always ignores, and it’s currently among the most relevant from a regulatory and insurance standpoint. The dryer area needs dedicated ventilation and a safe distance from ink storage areas. Disposal of spent photosensitive emulsion and stencil-washing solvents should be built into the layout from the start, with specific, well-ventilated containers – not treated as a problem to solve when the inspector knocks on the door. A well-designed workshop plans for these flows from day one.
Replace the physical label with a traceable digital workflow
Labelling boxes with QR codes was innovative ten years ago. Today, an efficient workshop links every order to a management system that tracks not just the physical location of the job, but also which Stencil, which halftone and which sequence of frames were used for that client. This isn’t a luxury reserved for large companies: Even a solo operator gains hours every week by not having to redo setups that were already done, simply because no one could remember where the original stencil was. Every workshop is different, and there is no universal layout. But the underlying principle stays the same: Measure the real workflow first, then design the space around it. Anyone who reorganises the workshop by moving only furniture and shelving will be back in the same spot twelve months from now.
November 2026 | 39 |
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68