Swimming Pool Scene RESIDENTIAL POOL SCENE
Construction method: Gunite concrete / tiled - - - - - - - - - - - - - - - - - - - - - Pump:
Starite 2 hp single phase Filtration method:
Hi Rate sand, 30’’ Lacron
Filtration rate: 34.5 M3
/M2 /HR
- - - - - - - - - - - - - - - - - - - - - Pipework: Certikin
Heating: Two stainless steel heat exchangers
off of oil boiler and an additional air source heat pump.
Water treatment: Tri chlorine tablets via chlorine feeder
time on spa. The pool excluding the surrounds was quoted at £160,000
inclusive. “At the time of quoting, we put in a provisional sum for the tiling and copings,” Richard explains. “But in the fullness of time, this was changed to suit the clients’ choice, and therefore there was a saving of £2,500
“The clients were amazed that I come clean and told them that it was cheaper than quoted,” jokes Richard. “As being in the Rich List they do tend to get ripped off!” New Dawn Pools Tel. 01367 253333
www.newdawnpools.co.uk
Swimming Pool Scene RESIDENTIAL POOL SCENE 21
PROJECT PROFILE
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92