search.noResults

search.searching

note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
TURBINE INSTALLATION


FEATURE SPONSOR


INCREASED LOAD CAPACITIES


....connecting markets


MPI Offshore’s fleet of purpose-built offshore foundation and wind turbine installation vessels plus an experienced team make us a world leader in offshore wind installation.


The NG-20000X is the solution for the installation of the next generation wind turbine components and foundations. This self-propelled jack-up design is characterised by a high variable load and large water- depth capability


Equipped with the GustoMSC integrated telescopic leg crane, the NG- 20000X is capable of installing heavy foundations and when the boom is fully extended it reaches adequate lifting height and capacity to install future generation wind turbine components.


RAPID INDUSTRY DEVELOPMENT


The windfarm installation market has developed rapidly over the last years. The wind turbines currently under design and testing will require a new generation of installation jack-ups to deal with the increasing weight and installation height of wind turbine components and the ever heavier foundations. However, a different strategic approach is required for the future turbines with capacities beyond 10MW.


Jan-Mark Meeuwisse, Commercial Director, GustoMSC commented: “Key to the new approach is to stop the spiralling trend of growing crane weights due to the increasing requirements related to the heavy foundations and high installation heights and to stay close to the proven design technology at the same time.


“By scaling up the jack-up design and jacking system and solving the challenging crane requirements in an innovative manner, the NG-20000X represents the next generation wind turbine installation jack-up in all its facets.”


ADVANTAGES


Exactly where you need us


MPI Workboats operate a fleet of high speed


crew transfer and offshore workboats - designed to operate in the demanding environment for the


Offshore Wind Industry. +44 (0) 1642 742200


info@uk.mpi-offshore.com www.mpi-offshore.com


6 www.windenergynetwork.co.uk


The NG-20000X design enjoys the advantages of the proven VSD jacking system and a large unobstructed deck area. The huge variable load capacity of 16,500 tons, enables the contractor to make a roundtrip carrying 6 complete sets of wind turbine components with a turbine weight of 1,000 tons, or carrying seven pieces of 900 ton jacket foundations, optimising the cost per installed turbine or foundation. Additionally, by further balancing out the jack-up design with an optimised leg design, the overall performance of the unit is improved.


KEY FEATURE A key feature is the innovative combination of high hoisting height for wind turbine installation and heavy load capability for foundation installation. To combine these two extreme requirements, GustoMSC has developed the telescopic leg crane. By introducing a telescopic boom that features a very high hook height when extended (1,250 metric tons at 160 metres) and offers an increased hoisting capacity when retracted (2,500 metric tons at 120 metres), it is possible to break the cycle of extremely long protruding booms and increasing crane weights, resulting in a more economic crane design and increased variable load available for operations.


The telescopic leg crane has been designed on the basis of its successful predecessors: the GustoMSC leg encircling crane designs.


GustoMSC


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95
Produced with Yudu - www.yudu.com