search.noResults

search.searching

note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
Auxiliary equipment


Diane XT 4 Master control panel Following standard operation modes are available, further functionalities on demand:


• Priority electricity demand: Mains power import / export control • Priority heat demand: Heat storage tank • Priority gas availability: Gas buffer tank level, LFG gas capacity • Island operation: Release uninterrupted switch from mains parallel to island operation additional to Priority electricity demand


• Island operation: Release of feeder Circuit breaker additional to Priority electricity demand


• Customized: Plant Operation sequence according customer request


Master synchronization Panel Master synchronization in combination with master control, will be combined into one control system / control panel.


Function The “Master Synchronization” is assigned for control of the mains circuit breaker (CB), as well as the selection and the release of the individual modules for isolated operation.


For power plants with 2 or more engines: • With control of 1 or more mains circuit breaker by GE • Uninterrupted island operation in case of mains failure • Blackout start • On request: Customized control procedures


Scope of supply • DIA.NE Server • Visualisation (Touch panel) • Synchronizing device • Mains monitoring device • Necessary coupling relays


Optional control of • Up to 4 the mains circuit breaker(s) – on special request • Up to 3 the section (tie) circuit breaker(s) – on special request


Options on demand


• Feeder control: Control for the release of up to 16 customer feeder circuit breakers depending on the actual available generator power, in order to limit the site load in case of a mains failure and in island mode


• Load bank and Rotating UPS control: Master Control for gas engines in combination with rotating UPS system, load banks for critical Voltage and Frequency stability requirements


• Load bank and integrated feeder control: Frequency and voltage stabilization during island mode startup phase and in case of fast load changes


• Fiber Optic Connection of a Remote Grid Circuit Breaker Enables: Island mode operation / main circuit breaker control in case of longer distances to a grid CB > 100 m to < 2000 m. The fibre optic connection between +ST2 (Remote control panel) and +ST (Master Synchronizing Panel ) is within customers scope of supply (Fibre optic cable and connection from customer)


• Status General: Master Control and Master Synchronization and Features are available with DIANE XT4


For further details or options please contact the CommOps Team


103


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147  |  Page 148  |  Page 149  |  Page 150  |  Page 151  |  Page 152  |  Page 153  |  Page 154  |  Page 155  |  Page 156  |  Page 157  |  Page 158  |  Page 159  |  Page 160  |  Page 161  |  Page 162  |  Page 163  |  Page 164  |  Page 165  |  Page 166  |  Page 167  |  Page 168  |  Page 169  |  Page 170  |  Page 171  |  Page 172  |  Page 173  |  Page 174  |  Page 175  |  Page 176  |  Page 177  |  Page 178  |  Page 179  |  Page 180  |  Page 181  |  Page 182  |  Page 183  |  Page 184  |  Page 185  |  Page 186  |  Page 187  |  Page 188  |  Page 189  |  Page 190  |  Page 191  |  Page 192  |  Page 193  |  Page 194  |  Page 195  |  Page 196  |  Page 197  |  Page 198  |  Page 199  |  Page 200