search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
S pecial Feature


Breaking new ground in creation


of ecological market town Ambitious modern development has seen large diameter plastic pipes successfully used for vital sewerage system components


Current trends in the construction industry towards offsite build and modular construction are enabling large diameter high density polyethylene (HDPE) structured wall products to lead the way in designing and delivering best value solutions. These products are helping solve complex design issues that might otherwise cause additional costs or programme delays and ultimately affect the ability to deliver major projects within budget and on time.


The new town of Sherford in the South Hams, Devon, has 5,500 homes, four schools and over 80,000m² of employment and retail space, and is located 28 miles to the east of Plymouth, equidistant between Dartmoor and the south Devon coast. Construction of the new town began in September 2014 following a prolonged 15-year planning phase, with 700 homes completed and habitable by September 2016. The first residents moved in during May 2017.


The project was delivered by Red Tree, the project founder and a consortium of housebuilders including Taylor Wimpey, Linden Homes and Bovis Homes. It is the aspiration of Red Tree that Sherford will be viewed in years to come as one of the West Country’s most admired market towns; one that has the feeling of being centuries in the making, but developed with responsible 21st century practices in mind, including affordable housing and the implementation of renewable energy.


And green practices are very much a focus for developers, Red Tree, who have claimed that Sherford will be the most green and sustainable new town in the country, conceived with a minimised carbon footprint in mind. All the houses are designed to be energy-efficient, and much of the energy will be provided by two wind turbines on site.


Ecologically sound


Additionally ecologically friendly good practice has been extended to the procurement processes on site, with many of the suppliers chosen committed to the green agenda. The overall green ethos is exemplified by the fact that the production and installation of the large diameter plastic pipes for the project has been proven to have a significantly reduced carbon footprint than other alternatives on the market, including concrete.


One of the fundamental considerations of any new development is the management of the site’s foul water. Using the standard Sewers for Adoption discharge figure of 4,000 litres per dwelling day for 5,500 dwellings gives a typical discharge rate of 254 litres per second. And so in order to efficiently manage the vast quantities of foul water flowing through the site once the development is populated, Fred Champion Groundworks commissioned a back-up storage tank for Sherford’s foul water pumping station. The vast 3.5-metre diameter, 30-metre long, multi-leg attenuation tank utilises 170 metres of plastic pipes, and holds approximately 1,500m3 of foul water.


The tank is much larger than its more standard sized counterparts, which usually hold around 200m3, and it connects directly to the town’s foul water pumping station. The tank was designed and made to the specific requirements of Fred Champion Groundworks, who were responsible for developing infrastructure for the site’s sewerage needs.


The tank was designed and supplied with an integral dry weather flow channel to meet the requirements set by South West Water. The dry weather flow channel is uniquely designed to improve the hydraulic efficiency of the tank in low flow conditions, helping to avoid silting.


The offline attenuation tank was prefabricated, and transported to the site in Devon in one piece prior to installation, vastly cutting down on the amount of time spent positioning the tank in situ; a huge bonus to the contractors who observed stringent scheduling.


Full accreditation


The system was also fully accredited to European standard BS EN 13476 - Plastics piping systems for non-pressure underground drainage and sewerage – structured wall piping systems of unplasticised poly(vinyl chloride) (PVc-U), polypropylene (PP) and polyethylene (PE).


Darren Williams, Technical Sales Engineer at BPF Pipes Group member Asset International, said: “A site with the scope and scale of Sherford requires significant


36 drain TRADER | October 2017 | www.draintraderltd.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79