S pecial Works


Successful egg-shaped repairs


for new Pillow Packer user An egg-shaped culvert with difficult access has been successfully repaired by CPS Drainage Solutions (CPS), during their first use of their new Pillow Packer.


“The culvert had partially collapsed causing a sinkhole in a prominent location, so an urgent repair was needed”, explained Neil Walton, Managing Director of CPS.


“Without the pillow packer, we would have had to wait for a hard-ended egg-shaped packer to be made and then we would still have had to excavate as the access was too restricted for that type of packer. Using the Pillow Packer certainly saved us both time and money and played a key part in getting the repair completed quickly.”


The company installed 6 patches within the culvert, over a 2-day operation, to completely restore it. The Pillow Packer was purchased with this job in mind, although Neil was initially considering it for another job.


“We discussed the product details with Source One Environmental (S1E), the supplier, and realised how helpful it could be for this repair. The conversation also helped in making sure we ordered the right specification,” Neil commented.


Training is offered from Source One Environmental (S1E) with every pillow packer purchased, but this repair was so urgent that CPS didn’t have time to undertake this prior to starting the job.


“S1E gave us lots of advice and also suggested we contact PBF Drainage. PBF have the most experience in the UK with this type of packer and they gave us some very useful tips for working with it on site,” stated Neil. “The installation was a learning experience but all the patches were installed successfully. Our customer, North Midlands Construction, has been delighted with the result.”


CPS has a list of similar jobs to complete in the near future. “We’ll certainly be using the pillow packer for these as there is a similar problem with access to all of the culverts. In each case, we can avoid excavation by using the pillow packer,” said Neil.


30 drain TRADER | October 2017 | www.draintraderltd.com


The partially collapsed culvert prior to repair


INSET: The culvert after repair;


BOTTOM RIGHT: The new pillow packer before the installation


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79