Kijlstra Systems save time at Sketty
Precast Concrete Drainage Systems by Kijlstra help improve water quality in Swansea Bay
Work has drawn to a close on a water project that could have taken another two months if precast concrete drainage systems by Kijlstra had not been used.
The final phase of the £3.5 million Welsh Water project to improve bathing and river water quality in the Sketty Green area of Swansea Bay for decades to come is now complete after six months. The project was particularly complex due to the location of the sewer pipe in the middle of Derwen Fawr Road, a key route in the area.
The major project by the not-for-profit company was designed to bring long-term benefits to the area by upgrading its waste water network to improve the network’s performance, particularly during wet weather. The work helps reduce the risk of potential bursts and flooding which in turn improves the quality of local bathing water.
Main contractor Morgan Sindall had taken two months to install the Kijlstra components which comprised a 50m3/50,000-litre, 16-metre long storage tank, three-metre long flow regulator chamber with two 1.5-metre long downstream culverts with end walls, as well as 11 other 1.5- metre long upstream culverts with dry weather flow channels (including two with end walls). The Kijlstra regulator chamber restricts water flow to 60 litres per second. Anything over that is stored in the tank for treatment at a later date.
These Kijlstra components for the culvert run for the CSO upgrade were manufactured at the company’s Somerset factory and delivered to site by truck for installation by a 100-tonne mobile crane.
Prior to leaving the factory the culverts are fitted with a rubber gasket seal which means the contractor does not have to prepare and prime the connections to fit jointing material, thus enabling a quick and easy push-fit installation.
Morgan Sindall site agent Byron Thomas estimates
installation would have taken twice as long had they used the traditional shutter and steelwork method.
“We wanted culverts to have dry weather flow channels as they were the most cost-efficient and practical solution. Other options would have been pipework.
“There were many benefits to using the Kijlstra systems, one of the main ones being the traditional method of shutters and steelwork would have taken twice
32 drain TRADER | October 2017 |
www.draintraderltd.com
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79