EIA topic
Change in project parameters from PEIR Scenario 1 (as applicable to each topic)
Seascape, Landscape and Visual Amenity Construction
Key changes in effect/s
Likely change in impact significance
Comment the assessment
Increased duration of construction works for onshore substation and cable installation as a result of Phasing
Haul road to be left in place between phases
Operation
Increased size of substation compound to 3.04ha
Decommissioning No change
Increase in duration of potential effects on landscape character and visual amenity due to length of construction works None
Detailed assessment required to determine if there is a change in significance
No change
Increase in duration of potential effects on landscape character and visual amenity due to length of construction works
Potential changes
The ES will update the assessment for the revised parameters
Phasing will be discussed in the construction impacts section of the assessment
Phase III Report June 2015
East Anglia THREE Offshore Windfarm Page 34
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49