Parameter length
Maximum interconnection cable length (to East Anglia ONE)
Maximum export cable length
Landfall Landfall location
Method for crossing intertidal
Number of cables Number of ducts
Number of transition bays
Number of transition bay construction compounds
Onshore export cables Grid connection location
Export cable route length Number of onshore cables Fibre Optic cables Number of joint bays
Phase IIa and Phase IIb Consultation Single Phase 1200MW (Scenario 1, 2014)
Phase III Consultation Single-Phased 1200MW Two Phased 600MWx 2
Not defined 4×155= 620
Mid way between Bawdsey and the mouth of the river Deben
HDD
Up to 4 Up to 4 Up to 4
1
Bramford substation 37km
Up to 4 (within pre-installed ducts) Up to 2 Up to 244 (1 per cable)
Phase III Report June 2015
4×95 = 380km No change No change
Pull cables through pre-installed ducts (installed by East Anglia ONE)
No change No change No change
No change
No change No change
Up to 12 (3 per duct if LFAC) within pre- installed ducts)
No change Up to 62 (1 at each of 62 locations) East Anglia THREE Offshore Windfarm Page 16
4×95 = 380km No change No change
Pull cables through pre-installed ducts (installed by East Anglia ONE)
No change No change No change
2 (1 during Phase 1 and one during Phase 2)
No change No change
Up to 12 (3 per duct if LFAC within pre- installed ducts)
No change Up to 124 (2 at each of 62 locations)
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49