Parameter level


Indicative minimum separation between turbines


Wind turbine foundation type options


Maximum number of offshore electrical platforms


Maximum number of accommodation platforms


Foundation types for offshore platforms


Number of met masts


Phase IIa and Phase IIb Consultation Single Phase 1200MW (Scenario 1, 2014)


Within row spacing 675m Between row spacing 900m


Number of wind turbine models Up to 3


Jackets, gravity base structures, suction caissons, monopiles


5 1


Jacket, gravity base, suction caisson or monopile


Up to two


Height of met masts (maximum) 150m (above lowest astronomical tide) 150.5 (above mean sea level)


Met mast foundation type options


Number of monitoring buoys


Maximum inter-array cable length


Maximum platform link cable


Jacket, gravity base, suction caisson or monopile


Up to four 550km 13×15 = 195km


Phase III Report June 2015


Phase III Consultation Single-Phased 1200MW


No change No change No change


No change 5 No change No change No change


160m (above lowest astronomical tide) 160.5 (above mean sea level)


No change No change No change No change East Anglia THREE Offshore Windfarm Page 15 Two Phased 600MWx 2


No change No change No change


No change 6 No change No change No change


160m (above lowest astronomical tide) 160.5 (above mean sea level)


No change No change No change 16×15 = 240km


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49