This page contains a Flash digital edition of a book.
Table 2.2 Proposed changes to the project description to include phasing and revision of engineering parameters Phase IIa and Phase IIb Consultation


Parameter


Offshore Capacity


East Anglia THREE site area (offshore)


Water depth


Distance from East Anglia THREE to shore (closest point of windfarm site to Lowestoft)


Maximum offshore cable corridor length


Maximum offshore cable corridor area


Interconnector cable corridor area


Number of wind turbines Proposed turbine capacity


Turbine rotor diameter (maximum)


Tip height (maximum) Minimum clearance above sea Single Phase 1200MW (Scenario 1, 2014)


1,200MW 305km2


Generally <45m but up to 49m 69km 155km


838km2 (note for final ES the area of interconnection will be added)


Not defined


100 - 172 units 7 - 12MW


154 – 220m 247.5 (above mean sea level) 22m (above mean high water springs)


Phase III Report June 2015


Single-Phased 1200MW No change No change No change No change


166km 454km2


238km2 (some of this area within the East Anglia ONE windfarm)


No change No change


No change


No change No change


East Anglia THREE Offshore Windfarm Page 14


Phase III Consultation Two Phased 600MWx 2 No change No change No change No change


166km 454km2


238km2 (some of this area within the East Anglia ONE windfarm)


No change No change


No change


No change No change


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49