EIA topic


Table 3.1 Offshore impact assessment screening (refer to Table 2.2 for any relevant changes in infrastructure) Key changes in effect/s


Change in project parameters (as applicable to each topic)


Marine Geology, Oceanography and Physical Processes Construction


There are limited changes in the infrastructure required – in the worst case one additional offshore platform and extra cable within the windfarm.


Phasing does not involve any changes above the worst case changes stated above


Operation


As above – limited changes in infrastructure during operation


Decommissioning


As above – limited changes in infrastructure to be removed at decommissioning


Marine Water & Sediment Quality Construction


There are limited changes in the infrastructure required – in the worst case one additional offshore platform and extra cable within the windfarm.


Phasing requires more vessel movements for construction, therefore greater risk of


Phase III Report June 2015


Magnitude of operational effects (e.g. scour) will be slightly higher due to extra infrastructure


As cables will be left in situ, the only additional impact is from the removal of one additional platform


There may be slight changes to suspended sediment from construction.


With regard to spills, these will be avoided by adoption of standard mitigation.


There will be greater disturbance of sediment (from cable installation), but this would be balanced by the longer duration of the construction phase


Likely change in impact significance


Given the limited changes (one platform and 45km of cable) compared to the scale of the proposed project – limited changes in magnitude of effect will not change the significance of impacts.


As above, limited changes in magnitude of effect will not change the significance of impacts.


As above, limited changes in magnitude of effect will not change the significance of impacts.


Given the limited changes (one platform and 45km of cable) compared to the scale of the proposed project – limited changes in magnitude of effect will not change the significance of impacts.


Spill risk will not increase. East Anglia THREE Offshore Windfarm Page 20


The ES will update the assessment for the revised parameters.


Phasing will be discussed for construction impacts


Comment


The ES will update the assessment for the revised parameters.


Phasing will be discussed for construction impacts


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49