3 IMPACT ASSESSMENT SCREENING
3.1 Introduction 32.
33.
This section of the report considers the implications of the revisions to the project design parameters upon offshore and onshore receptors in relation to the significance of impacts that were assessed for the PEIR.
Table 3.1 and Table 3.2 describe the design changes relevant to each offshore topic, how they change the effect previously assessed, and whether that results in a change to the significance of impacts for that topic. The assessment provided is a high-level expert judgement provided by relevant specialist consultants. The final ES will provide a full and detailed assessment for each topic.
3.2 Offshore 34.
The key change affecting the offshore receptors is the potential to construct the offshore infrastructure in a Two Phased approach. This has some implications for the infrastructure needed (see Table 3.1) i.e. there are some differences between the requirements of the Two Phased approach even though the final installed windfarm capacity in megawatts would be the same. Design changes onshore, such as the cable ducts being installed during the construction of East Anglia ONE, will not affect the offshore construction, therefore these are not considered in Table 3.1.
Phase III Report June 2015
East Anglia THREE Offshore Windfarm Page 19
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49