CHANGING ROOMS
Redesign your changing
rooms with
3D Design Rendering Lockers
Locking Systems Cubicles
Washrooms
Redesign your changing
rooms with
reason, lockers were put in the gym as well as the changing rooms, which meant they had to fit with the new gym floor and new Technogym equipment. Safe Space Lockers provided stylish wood and glass lockers, which Ojmar
S
3D Design Rendering Lockers
Locking Systems Cubicles
Washrooms COMBINED ACCESS CARD
Client: GLL/Better Supplier: Safe Space Lockers & Ojmar
pace was at a premium at the GLL-run Charlton Lido, which meant that every square foot had to be maximised. For this
complemented with a key-free OTS lock using its RFID system. One crucial
feature was that
Ojmar’s partnership with Technogym meant that Technogym wellness keys could be used with the OTS locks, meaning gym members could have just one key for lockers, membership, fi tness management and access into the facility. “Previously, people would need a
pound for a locker, a membership card, cash and a key, but the Technogym key
Changing rooms feature Corian tiles, solid beech seating and bright colours MADE TO MEASURE
Client: Rambert Dance Company Supplier: Kemmlit
Safe Space Lockers Ltd Please call
0870 990 7989 for more details E:
info@safespacelockers.co.uk
www.safespacelockers.co.uk Safe Space Lockers Ltd O
0870 990 7989 for more details E:
info@safespacelockers.co.uk
www.safespacelockers.co.uk
dance studios, workshops, technical and administration facilities and changing rooms. There’s also a dance archive and a reading room, both of which are open to the public. Architects Allies Morrison specifi ed
Please call
a high build quality and the changing rooms had to be in keeping with this. The architects asked Kemmlit for 60
ne of the UK’s foremost dance institutions, Rambert Dance Company, created a new £8m headquarters on
London’s South Bank last December. The facility includes three large
made-to-measure lockers in a variety of sizes and colours, to accommodate all the different needs of dancers, including
large bags and even some places to keep prosthetic limbs. Corian tiles, glass cubicles, slatted
solid beach seating and a mix of yellow, blue and white lockers were used to create a high quality fi nish. “This project presented us with
a number of challenges,” says Julian Lidstone, head of Kemmlit’s UK operation. “For example, the client wanted to incorporate coat hooks on the outside of the lockers, while retaining strength, and we had to manufacture in different sizes and colours within a tight timeframe.”
April 2014 © Cybertrek 2014
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92