This page contains a Flash digital edition of a book.
JUDGES’ COMMENT


“Strong submission from a good all-round company. A company that works at a diff erent level to most in the industry”


The replacement fl at roof (seen here) had to be waterproof and robust, so BriggsAmasco specifi ed 56,000 m² of Sarnafi l single ply roofi ng system


Roofing WINNER BRIGGS AMASCO


BriggsAmasco is a specialist national roofi ng and waterproofi ng contractor operating from 11 branches throughout the UK, with its head offi ce in the West Midlands. Its 200 operatives hold CSCS


cards and are trained in the application of traditional roofi ng and waterproofi ng materials such as mastic asphalt, reinforced bituminous membranes, single ply, hot melt, sheeting and cladding and cold applied liquid waterproofi ng. The company recently replaced


the roof of a large distribution warehouse in Cheshire for client Excel Europe. The replacement fl at roof had to be waterproof and robust, so BriggsAmasco specifi ed 56,000 m² of Sarnafi l single ply roofi ng system as part of the £1.3 million contract. The warehouse was to be used


by logistics specialist DHL and DIY retailer B&Q. The massive roof incorporated Sarnafi l’s S327-12EL membrane in light grey to provide


www.cnplus.co.uk


a lightweight yet watertight roofi ng solution. The BriggsAmasco installation


team used the fl exibility of this mechanically fastened single ply membrane, enabling a smooth and effi cient installation on to the existing roof covering with a Sarnafi l Type T Separating Fleece layer laid beneath. The 320-strong company has,


since 1994, been developing strategic partnerships with leading suppliers to help provide customers with the best and most technically appropriate solutions. Now more than 90 per cent of the company’s purchasing needs are met by just 30 supply partners. BriggsAmasco’s accounts


manager develops and maintains partnering relationships on a national basis with all of key customers. The company off ers a range of extended credit terms with its preferred suppliers, while key customers receive the best terms available and benefi t from


having their own dedicated credit control manager. In the past 12 months some


504 days have been allocated to individual staff and operative training both on site and at the company’s dedicated training centre in the West Midlands. The company has a policy of


promotion from within, and supports employees in vocational and educational training. BriggsAmasco has also been


accepted under the Safecontractor scheme for its ongoing commitment to health and safety and continues to have one of the best training records for new apprentices and other key employees in the industry. In the past 12 months,


BriggsAmasco carried out some 1,200 contracts varying in value from £1,000 to £3.7m. Turnover has increased 10 per


cent compared with last year and the company hopes to expand to off er photovoltaics within roofi ng contracts in the future.


5 April 2012 | 45


FINALISTS HIGHLY COMMENDED:


O’BRIEN ROOFING & LEADWORK BREYER ROOFING FK CONSTRUCTION GEOFF NEAL ROOFING KGM ROOFING


WEATHERWISE SPECIAL PROJECTS


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29