This page contains a Flash digital edition of a book.
Patrick ‘Cal’ Callaby is Workshop Manager at the Celtic Manor Resort in South Wales. Whether it’s a full on televised tournament or just a ‘special event’ a heightened level of care is required on the course.


In this article Cal explains how Celtic Manor staff operate during the Wales Open.


will ‘swim’ on the next height of cut change. It’s a matter of timing and, at this stage, economy of blades (for me anyway) does not come into it, only the playing surface. ‘Salvage’ can be addressed later. A week before the tournament we sharpen all fairway and trim mowers and grind all the pedestrian tees mowers at the end of that week.


The final height of cut on the greens is now getting close and any problems will soon make an appearance. The pedestrian greens mowers are tickled on the grinder after each use and their performance on the greens is carefully monitored, every mark is scrutinised, diagnosed and addressed. Practice Day 1 is upon us; the compound is a hive of activity at 4:30am as the greenkeepers get in the starting blocks. Everything has been prepared the day before so it’s a “jump in and go” type start. Early tee-offs make every minute count and a great deal of organisation regarding the route each individual operator must take to their work place has occurred. If mistakes are going to be made, or the plan has to be modified, then now is the time. Some 15-20 minutes after the


greenkeepers commence mowing our tournament support truck leaves the compound and the duty technician trawls


around the course, mobile phone and 2- way radio at the ready, parking occasionally and looking at greens to see if there are problems looming. My team of three take turns with this. I depart 30- 40 minutes later and drive around the course stopping at each green that has been cut, keeping an eye out for any problems, with my mobile phone, 2-way radio, prism, macroscope and kneeling board all in my vehicle. Hopefully the work progresses without incident and, when all the tasks are completed, the greenkeepers on their various machines assemble with the Course Manager, his Head Greenkeeper and our support truck and all travel in together in a convoy. This ensures that seasonal people, not totally familiar with the estate, do not get lost and all machines take the same route to keep away from the golf action. Once back at the maintenance compound our workshop staff then get busy to prepare for the after-play cut. Greens mowers are washed off and refueled by the greenkeepers, and brought to the workshop for a few passes on the Express Dual grinder and any height of cut adjustments the ‘boss’ decides are necessary. Fairway, trim and tees mowers are also


checked for cut, adjusted as necessary and any problems addressed.


We will next turn our attention to the other two courses, although work on these is minimised for the duration of the tournament. Machines from a different fleet have been prepared and are dispatched, they are usually back by lunchtime and then the staff restaurant is attacked by ravenous greenkeepers, where hotel workers can be trampled underfoot and the servery left bare, apart from the odd wisp of steam.


By this time the workshop has come to the end of its work until the after-play cut is completed. It is now time for the technicians to have some lunch. Each year we hire in a couple of pool tables, darts board, putting ‘green’ and a ping- pong table. This keeps the greenkeepers amused between work periods for the first part but, towards the end of the week, everyone will be getting tired and bodies are crashed out everywhere, arguments arise from nothing and all are getting irritable. The end, however, is in sight.


It goes without saying that good


forward planning is essential if the tournament is to run without a hitch. An example of this is the greens ‘squeegees’, which have previously been checked over and are now put out ready for use as, this year, there is the threat of rain. The crew bus is washed to smarten it up and any


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140
Produced with Yudu - www.yudu.com