This page contains a Flash digital edition of a book.
When Halifax Town FC went into administration, the club were relegated three divisions to the Unibond North but, with a succesful rugby league side sharing the facilities, work on the stadium pitch continues, despite finances being tight and equipment being slight!


HALIFAX DOWN BUT NOT OUT! T


he Shay Stadium in Halifax is owned by Calderdale Council and is leased to The Shay Stadium Trust Limited


(SST). SST is a not for profit company which is a Company Limited by Guarantee, and its four members are the two professional clubs, Halifax Town FC and Halifax RLFC, and their two independent supporters trusts. There have been concerns of late in respect of the football club which is now a member of Unibond North rather than the Conference, having been relegated three divisions as a result of it being in administration. Halifax Rugby League FC play in the Co-Operative National League One where they currently lie second behind Salford Reds. The full area covered by the lease is nearly 13 acres and this is managed by a staff of three which comprises: Geoff Butler, Chief Executive and Stadium Manager, Graham Osbourne, Head Groundsman and Assistant Stadium Manager and Mark Hans, Groundsman and Stadium Supervisor. All administration work is the


responsibility of Geoff while all work, both on the pitch and in the remainder of the stadium, is carried out by Graham and Mark. Graham’s role also includes the management of parking on the site, and the five-a-side artificial pitch which produces significant income to the stadium finances.


The stadium pitch is natural grass that is, essentially, sand based but this is only due to a significant amount of sand


40


having been applied as a surface dressing over the years. The sub base is poor quality material, some of which is due to the fact that The Shay is on the site of an old tip. Additional problems have also been caused by a layer of clay approximately 500mm below the surface in certain areas of the pitch, which remained from the old speedway track that was based at the stadium some time ago.


Over the past few years, in what has been considered to be the close season for the pitch, the clay has been progressively removed and significant areas that suffered from poor drainage have been restored to normal use. With both professional football and rugby clubs using The Shay, the pitch has to be available for use all the year round. This year the groundstaff have had the ‘luxury’ of thirty three days to carry out essential work on the pitch. Last year it was just twenty days!


The equipment available is pretty basic; a Ransome Mastif mower that is over ten years old, an eight year old Dennis mower and a Kubota tractor that has clocked up over thirty years service, The work carried out on the pitch in the close season included scarifying, disc seeding, topdressing with 90 tonne of rootzone 70:30 mix which was vertidrained and brushed in. Drainage and soakaways were provided for the wet spots, which had resulted from the heavy rain in the winter and the continual use of the pitch due to hosting both football


Graham Osbourne


and rugby league over this period, It had been hoped to provide a new system of pitch drainage as the current system is totally ineffective. However, this was cancelled because SST did not have sufficient funds to cover the cost. Problems are experienced every winter due to the southern half of the pitch not seeing any sun and, as a result, there is a continual reviewing of weather forecasts as it has been found that the southern half of the pitch can experience much lower temperature than the northern areas.


It is a requirement of the lease that The Shay is used for a number of amateur finals which, this year, has totalled fifteen. Due to the rugby club playing less matches than the football club they are allowed to use the pitch for an agreed number of training sessions and academy fixtures.


Overall the use of the pitch in the year is the equivalent of approximately 80 matches.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140
Produced with Yudu - www.yudu.com