Results of Independently Verified Trials Announced
Independently verified trial results have confirmed the substantial money, energy and carbon emission savings that can be achieved by fitting a VPhase unit. VPhase plc has released the data from trials that took place across several properties in the UK, showing savings in electricity consumption of between 6% and 12%. Results have been verified by EA Technology, which has confirmed that these reductions could save the respective homeowners between £75 and £135 per year on their annual electricity bills. This equates to carbon savings of 390 to 708 kg per annum.
...searchable archive at www.buildingconstructiondesign.eu
Tel: 0845 003 8235 www.vphase.com
Voltage Optimisation Now Available To Homeowners
normally 220V in the UK. The result is considerable reductions to electricity costs, reduced wasted energy and lower carbon emissions. It can be easily fitted by a qualified electrician and will save energy across a wide range of appliances throughout the home.
...searchable archive at www.buildingconstructiondesign.eu
Tel: 0845 003 8235 www.vphase.com
Sedum Green Roofs from Wallbarn
A full range of green roofs and living wall systems are available, from low build-up, low maintenance sedum roofs up to intensive succulent vegetation and trees. Wallbarn grows its sedum for up to six months before installation, so clients receive healthy, rapidly growing flowering plants instead of patchy, shocked vegetation. We have many different types of grasses and sedums to add depth and colour to plain flat roof extensions and other small areas. Wallbarn also supplies modular systems, where the sedum, substrate and drainage layers are supplied as ready grown kits, for an instant, easy-to-install green roof.
...searchable archive at www.buildingconstructiondesign.eu
Tel: 01883 715983 www.wallbarn.com
New Product Portfolio for 2010
heating timers and wiring centres available on the market today, our Wire- eez Wiring Centre will make light work of installing any heating system because it is designed with the heating engineer in mind. It’s so easy to wire that we expect it to reduce labour time on installation and maintenance cost’s throughout its lifespan, no more messy wires or tangled bird nests, its simplicity in a box! In addition to this product we have a range of intelligent time clocks that are so easy to use and setup that you will wonder how you ever managed before.
...searchable archive at www.buildingconstructiondesign.eu
Enquire via:
Our online database at www.buildingconstructiondesign.eu
Warmworld have a new Product Portfolio for 2010 making their range of energy efficient controls even larger. January sees the launch of 3 new products that will assist installers and end users alike. Gary Belgium MD states, “We have an exciting low cost high quality alternative to the current range of central
VPhase plc will be exhibiting its new voltage optimisation device at Ecobuild 2010, which delivers homeowners immediate and significant money and energy savings across the whole home, without compromising their quality of living. The low-cost VPhase unit reduces and stabilises the incoming voltage to homes and manages it to a stable level,
Post using Enquiry Card
See inside back cover and Fax to 01435 863897
243
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116 |
Page 117 |
Page 118 |
Page 119 |
Page 120 |
Page 121 |
Page 122 |
Page 123 |
Page 124 |
Page 125 |
Page 126 |
Page 127 |
Page 128 |
Page 129 |
Page 130 |
Page 131 |
Page 132 |
Page 133 |
Page 134 |
Page 135 |
Page 136 |
Page 137 |
Page 138 |
Page 139 |
Page 140 |
Page 141 |
Page 142 |
Page 143 |
Page 144 |
Page 145 |
Page 146 |
Page 147 |
Page 148 |
Page 149 |
Page 150 |
Page 151 |
Page 152 |
Page 153 |
Page 154 |
Page 155 |
Page 156 |
Page 157 |
Page 158 |
Page 159 |
Page 160 |
Page 161 |
Page 162 |
Page 163 |
Page 164 |
Page 165 |
Page 166 |
Page 167 |
Page 168 |
Page 169 |
Page 170 |
Page 171 |
Page 172 |
Page 173 |
Page 174 |
Page 175 |
Page 176 |
Page 177 |
Page 178 |
Page 179 |
Page 180 |
Page 181 |
Page 182 |
Page 183 |
Page 184 |
Page 185 |
Page 186 |
Page 187 |
Page 188 |
Page 189 |
Page 190 |
Page 191 |
Page 192 |
Page 193 |
Page 194 |
Page 195 |
Page 196 |
Page 197 |
Page 198 |
Page 199 |
Page 200 |
Page 201 |
Page 202 |
Page 203 |
Page 204 |
Page 205 |
Page 206 |
Page 207 |
Page 208 |
Page 209 |
Page 210 |
Page 211 |
Page 212 |
Page 213 |
Page 214 |
Page 215 |
Page 216 |
Page 217 |
Page 218 |
Page 219 |
Page 220 |
Page 221 |
Page 222 |
Page 223 |
Page 224 |
Page 225 |
Page 226 |
Page 227 |
Page 228 |
Page 229 |
Page 230 |
Page 231 |
Page 232 |
Page 233 |
Page 234 |
Page 235 |
Page 236 |
Page 237 |
Page 238 |
Page 239 |
Page 240 |
Page 241 |
Page 242 |
Page 243 |
Page 244 |
Page 245 |
Page 246 |
Page 247 |
Page 248 |
Page 249 |
Page 250