REHEAT – INSIGHTS FROM INDUSTRY REQ
HEAT METERS
accurate data gathering system
When a large Building Management Systems
Expert metering advice should be obtained at the start
of any new build project, says David Gleadhill, MWA Commercial Director
M
eters losing money? Ever evolving compliance
surrounding metering can be a
and cost cutting at the beginning of a project revenue and huge disruption later on.
the heat meters installed in the design and to concerns around compliance.
the data sent to the Building Management landlord’s ability to bill tenants. gathering and meets all billing requirements. “We are frequently asked to investigate
disruption of putting things right could have
easily been avoided. Mistakes are often due of the requirements and concerns raised can prevent the total billing of a site until MWA advises expert metering advice is build project.
REQ
FOR FURTHER INFORMATION Tel: +44(0) 121 327 7771 Email:
info@mwatechnology.com www.mwatechnology.com
22 REQ RENEWABLE ENERGY QUARTERLY |
|
AUTUMN 2014
www.r-e-a.net
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40