Case Studies 37 The cool preservation of history
NG Bailey has completed and handed over the paper archive area of Manchester Central Library, marking a technical milestone in the ambitious transformation of Manchester’s Town Hall extension and Central Library.
HUNDREDS OF MANCHESTER Central Library’s most historical paper documents have been returned to the archive following the extensive work to refurbish the lower ground floor archive area as part of Manchester City Council’s project to transform the Grade II listed buildings. This comes as NG Bailey completes a full scope of mechanical and electrical services, working alongside main contractor Laing O’Rourke as part of the three-year construction project.
The transformation of the buildings includes opening up more of the space to the public than ever before, and improving services while also restoring key heritage features.
The renovation of the paper storage rooms was a particularly important part of the project – to preserve the library’s most valuable paper archives in environmental conditions meeting National Archives standards while reducing the carbon footprint, fuel and other operating costs.
It involved installing powered racking for the books, pamphlets and other documents, as well as stringent heating and lighting controls.
Mike Darlington, managing director of NG Bailey’s engineering division, said: “This project has been a real opportunity
Visit ACR News online at
www.acr-news.com
to use our expertise installing 21st Century services into a preserved Grade II listed building. It has also been an exciting challenge to meet the standards required as the building is listed.
“We had to work really hard to install the modern facilities and air conditioning within an existing fabric that couldn’t be touched. Our design and construction teams worked extremely closely with the client and English Heritage to achieve the results.
“Alongside this we had to control the humidity of an area with floors made out of concrete – so securing a stable environment with such a porous material was a big achievement for us.” Councillor Rosa Battle, executive member for Culture and Leisure for Manchester City Council, said: “From floor to ceiling to its state-of-the-art facilities, the transformation of Manchester Central Library has been all about painstaking attention to detail. The enthusiastic reactions show that Central Library is a spectacular asset for the city.”
The key to achieving this in the storage rooms was to steadily bring temperature and humidity down to stable conditions at the agreed set points, which took the team three months to achieve. The conditions in the rooms are being controlled using
“This project has been a real opportunity to use our expertise installing 21st Century services into a preserved Grade II listed building.”
a sophisticated Building Management System, allowing the Manchester City Council team to monitor and watch conditions at a minute level and spot any potentially damaging environmental changes as soon as they occur. Now complete, the transformed Town Hall Extension and Central Library has provided a bright and spacious ground floor, which was previously closed to the public, into a light and airy space with a cafe, performance area and film booths. There is also a specialist search room where staff can help readers to access some of the library’s most historic and valuable works, which are stored in the climate- controlled book depositories on the lower floor.
More than 2,000 people passed through the doors of the St Peter’s Square landmark in the first three hours after it reopened.
ACR News July 2014
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48