Feature Lighting


Birmingham New Street station receives lighting upgrade


Wieland Electric has helped transform Birmingham New Street station by supply- ing its gesis 2-, 5- and 6-pole pluggable installation system with integrated DALI to feed lighting round the station’s new con- course. The project has been more than three years in the making, with the first phase of the new concourse now complet- ed and open to passengers. The station is the busiest interchange station on Britain’s national rail network and previously was dark, unwelcoming and overcrowded, with poor access for passengers. The regeneration project has seen a much needed, bigger and brighter new concourse with improved access to all platforms, including 36 new escalators and 15 lifts reaching every platform.


Wieland’s gesis pluggable system was


the preferred choice as it allows for quick and easy error-free installation on-site. Wieland were also able to adhere to strict delivery times to keep the project on schedule. The gesis range of compo- nents come pre-assembled and tested so stripping, clamping and cutting to length is not required.


The range comprises of connectors, radio controlled switching devices, devices for remote building automation and pluggable distribution boxes for modern facility management, cables and busbars as well as low voltage systems. Wieland Electric www.wieland.co.uk T: 01483 531 213


Enter 237 Lighting the way for the EICC


Eaton’s Cooper Lighting and Safety has provided energy effi- cient lighting for the extension to the iconic Edinburgh International Conference Centre (EICC), which opened its new events space earlier this year. The project included a custom built solution for mains lighting, emergency lighting and a central battery unit to run the building’s entire emergency lighting system. The EICC had two key demands from the lighting. First, it had to be energy efficient and second, it had to be discreet and dimmable to zero percent to avoid interference with the performing artists. “Sustainability is important to us and maximising our energy


efficiency was vital,” said Hans Rissmann, chief executive at the EICC. “Eaton’s Cooper Lighting and Safety system was chosen as it presented the most energy effi- cient solution, while at the same time being able to meet our spe- cific need for dimmable lighting.” “From the outset there was a challenge set by the EICC, who were unsure if it would be possi- ble to dim LEDs in the same way as can be done with halogen luminaries,” added Paul Gregory, specification sales director at Eaton’s Cooper Lighting and Safety. “Our lighting experts worked closely with the team from the EICC to fully understand their requirements and designed a bespoke solution which is a real first for the lighting and control industry, something unmatched by any other organisation.” To read the full story visit


www.connectingindustry.com/eicc Cooper Lighting & Safety www.cooper-ls.com T: 01302 303 200


Electrical Engineering OCTOBER 2013


Enter 238 Enter 14


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56