This page contains a Flash digital edition of a book.
Innovative trains


configuration means vehicles can be supplied in lengths ranging from 18m to 72m (see panel) and all bogies can be motorised if required. Because each 9m section runs on its own bogie, additional sections can be added easily and no auxiliary bogie is required for splitting the vehicles during maintenance.


Customers


When the Avenio concept was first unveiled in March 2009 it was indicated that Tel Aviv was likely to be the debut customer with an order for 72m-long vehicles, although the cancellation of the build-operate-transfer concession in 2010 means an order for vehicles has yet to be placed.


Last November it was announced that Hague Tramways (HTM) would be the first official Avenio customer after signing a ƒ100m contract with Siemens for 40 bi-directional vehicles (see panel on p63). The deal includes driver training, documentation, and spare parts, as well as an option for up to 40 additional vehicles. They will be assembled at Siemens’ Simmering plant in Vienna and deliveries will take place between February 2014 and February 2015. Another important breakthrough came at the end of July, when Siemens revealed it had received a ƒ100m turnkey contract from the Qatar Foundation to equip the 11.5km light rail line that will link Education City with the Doha Metro. In addition to signalling and communications systems, electrification, and depot equipment, the contract includes a fleet of 19 Avenios, which will be equipped with the Sitras HES system for catenary-free operation. The roof-mounted Sitras HES


Avenio passenger capacity Length (m)


2.3


18 27 36 45 54 63 72


Width (m) 2.4 2.65


105 110 120 165 170 180 225 230 250 285 290 310 340 350 380 400 410 450 460 470 510


Based on occupancy of 4 passengers/m2 on a bidirectional vehicle


module combines a double-layer capacitor with a NiMH battery, allowing the vehicle to store both traction and braking energy. Power converters transform the three-phase current with a rated voltage of 11kV into the 750V dc required for charging the energy storage unit. The system will complete its charging cycle in just 20 seconds, taking power from charging points installed at each of the line’s 25 stations, which will be fed by centralised rectifier substations. The LRVs will also be adapted to operations in high temperatures, with a powerful air-conditioning system and sun shades to protect roof-mounted electrical equipment from radiant heat. The 27.7m-long vehicles will feature a 2.55m-wide bodyshell and will accommodate up to 239 passengers. The line is due to open in autumn 2015 and will undoubtedly become a reference project for Siemens light rail technology in the region, as well as a global showcase for Sitras HES and Avenio itself. In the meantime, visitors to InnoTrans in Berlin this month will have the opportunity to inspect a full- size mock-up of the Avenio for The Hague. IRJ


NEW PRODUCTS FOR INNOTRANS Hall 23 Stand 210


www.geatech.it The roof-mounted Sitras HES energy storage module. 66 IRJ September 2012


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126