F EMAS 2 0 1 9 S TANDARD
PUBLISHED AIC Services has published an updated FEMAS standard for the assurance scheme for producers and suppliers of feed ingredients. The publication is a result of extensive
review by the FEMAS Review Group in consultation with the certification body, FEMAS participants and auditors. The new version of the FEMAS Standard will be applicable from May 1st
TO R E FURB OR NOT TO
REFURB….. Managers at a Somerset feed mill were faced with the costly task of either demolishing and replacing four large Crittal designed mineral silos or a not so costly refurbishment. They chose the latter and Game Engineering was on hand with the expertise and ideas to make it happen. A change of product meant that the four
2019 and
scheme participants will be required to implement it from that date. There will be no transition period for the new standard. However, any participant with an audit booked on May 1st
will have two months to
prepare, and up to 60 days to rectify any non- conformances. Simon Williams, Technical Manager for
AIC Services, said: “FEMAS is one of the critical assurance schemes delivered by AIC Services which provide assurance right across the supply chain and ultimately link into the Red Tractor scheme providing assurance to retailers and the consumer. We are committed to a process of reviewing and improving these schemes to ensure that they continue to be fit for purpose and deliver the highest possible standards across the industry.”
ADISSEO AND KEMIN ANNOUNCE JOINT DECISION TO NOT RENEW EXISTING RUMINANT
DISTRIBUTION AGREEMENT Adisseo and Kemin have announced the decision to not renew their distribution agreement involving the Smartamine® MetaSmart®
, and Microvit® A Supra Ruminant
products in EMEA, beyond its current term – which ends on 31st of December 2019. Until that date, Kemin remains the exclusive distributor of Adisseo products Smartamine® MetaSmart®
, and Microvit® A Supra 1000 Ruminant for the EAME region.
Above: Wooden tops of two of the four bins with the new filters, blowpipe, diverter valves for routing and the electrical installation all part of GAME Engineering project supply
Crittal silos, which had been installed many years ago, were now totally unsuitable. While the decision to refurbish the existing silos had considerable financial advantages, for the Game Engineering team, it was not the easiest of tasks. Before the refurbishment part of the
project could start redundant items such as conveyers with slides and ducting, a small dust filter and three vertical vacuum pipes had to be removed. Once this was completed, the inside of each silo was thoroughly cleaned to remove any corrosion or past product trace. The most important part of the project
could then start. Each silo had to be completely relined – two with 3mm mild steel plate and two with 3mm stainless steel plate. In order
for this to be done safely, a ring beam was constructed and floored with wooden planks to provide a work platform that could be raised or lowered as required. The lining plates could then be riveted to the inside of each silo starting at the bottom and working upwards. With the silo plating completed, new
square-to-round hoppers were fitted to the bottoms of each silo along with four new 200mm diameter screw conveyors which link to a central 300mm screw conveyor. This central screw conveyor deposits ingredients into a weigh hopper which is mounted on load cells. The final part of the project was the installation of a new pneumatic intake system which allows the silos to be filled by road tankers. For more information please contact Adam Conroy at Game Engineering on 01522 868021 or
email
aconroy@gameengineering.com
FEED COMPOUNDER MAY/JUNE 2019 PAGE 57
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68