SPONSORED BY Contractor hub Enter the prefab era Carl Ghinn, Fixmart MD I


With increasing costs and time pressures and a continuing skills shortage, many companies see prefabrication as a potential solution to these problems. Carl Ghinn, managing director of Fixmart explores the challenges and advantages


n recent years, there has been a big increase in the use of prefabrication in the construction industry. In fact, it was revealed at the beginning of September 2017 that construction giant Lendlease had picked an offsite specialist to assist with the prefabricated design of Google’s new headquarters in London. According to the HVAC body BESA, offsite


construction is now used in 90% of UK projects and accounts for 3 to 4% of the total construction market. With leading companies such as Google and Crossrail choosing to use it in their landmark projects, we can expect these numbers to continue to rise. However, whilst there are obvious benefits, when we talk to our clients many have concerns that pre-building large parts of projects offsite could result in sizing errors, a reduction in quality and can make deliveries even more complex than they already are. As a key supplier to the industry we are keen to help address these concerns and enable our customers to gain maximum competitive advantage from this new trend.


Challenges


There are valid concerns within the industry about using prefabricated components in a project. The first is the inability to react to unexpected changes during the installation process. It is impossible to fully predict what can happen on a fast-moving construction site. Normally, workers will prepare for unforeseen changes, such as additional corners, as they occur. However, if the component is assembled offsite and then a problem arises, the sub-contractor would either have to return the product and wait for a replacement, or attempt to fix it themselves. This can then cause a delay on the project and result in


large fines handed out to the sub-contractor. Another key consideration is the increasingly strict delivery restrictions. There are specific rules that delivery companies must comply with before they are allowed on site. Many require vehicles to be FORS accredited, which promotes best practice in terms of safety, efficiency and environmental protection. I have also known delivery drivers to be turned away if they are wearing shorts rather than trousers due to health and safety regulations. Similarly, if a product isn’t packaged properly it


can become a safety risk and the site manager won’t accept the delivery. Pre-assembled components are much larger and therefore more complex to transport. It is imperative that suppliers and their delivery services are aware of these regulations and take steps to avoid a failed delivery.


Benefits


However, there are a number of benefits for using prefabrication on a project. One of the biggest is cost saving as it requires fewer people, takes less time, and potentially reduces risk of delays. It is no secret that there is a skills shortage in the construction industry. Large numbers of Eastern European workers have returned home, partly due to the weaker pound, but also because of the uncertainty surrounding Brexit. This, combined with fewer young people choosing plumbing and other manual jobs as careers, has resulted in a dramatic decrease in the number of skilled workers. However, utilising prefabrication simplifies the installation process as workers only need to fit the component rather than cut it to size. As a result, not only does it reduce the amount of labour needed on a job, but also the time it takes to install.


In addition, some argue that it improves the quality of the products being used as they are being measured and fitted in a controlled environment. This reduces the risk of delays due to faulty or ill- fitting products. As many sub-contractors operating on sites are working to very strict margins and timeframes, the slightest delay can be the difference between a loss and profit on a project. Utilising prefabrication can provide developers and sub-contractors with peace of mind.


Solution


As a supplier, we are able to do a number of things that will help our clients embrace prefabrication and use it to their advantage. This includes pre- cutting channel and ductwork to exact requirements and assembling products in our warehouse before they are delivered to site. We have also specially modified our delivery vehicles for larger and longer products. In my opinion, it is important to build trust with


your clients by ensuring every product you provide is of a high quality and fit for purpose. I would also advise finding a supplier that offers flexible delivery solutions, such as timed delivery slots, as well as one that understands the complexities of delivery regulations. With the big names beginning to embrace and explore prefabricated construction it is only a matter of time that it becomes the norm on projects across the UK. Yes, it is a natural solution to the many issues facing the construction industry today, but there are a number challenges it brings which a supplier who understands the difficulties of prefabrication will be able to overcome.


NATURALLY INSPIRED EFFICIENCY Y


built for speed 


  


•  www.heatingandventilating.net


 


November 2017





Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60