BSEE WIRING REGULATIONS
With the 18th Edion around the corner, it’s vital that electrical contractors take the me to get familiar with the latest changes to the IET Wiring Regulaons (BS 7671), writes Jocelyn Golding, Electrician Programme Manager at
Schneider Electric. E
lectricians have been given a six-month grace period to get their houses in order, starting on the 1st July. After this, it is expected that all electrical contractors will have achieved compliance with the new 18th Edition IET Wiring Regulations (BS 7671). The latest edition has updated standards in line with advances in technology, including updates to technical data. These updates will have a direct impact on making installations safer. In addition, the 18th Edition contains a new appendix on energy efficiency, reflecting the country’s need to reduce the overall consumption of energy. For electricians to be ready for January, it is important to get to grips with the changes now.
Changes that you can’t ignore
Changes in regulations around fire safety, protection against voltage overloads, and wiring systems are all listed in the 18th Edition. This will impact how electricians perform their work from day-to-day, affecting the length of time spent at each install and the expenditure on equipment:
1. Recommendation for installation of Arc Fault Detection Devices
A new Regulation has been introduced recommending the installation of Arc Fault Detection Devices (AFDDs) to mitigate the risk of fire due to the effects of arc fault currents. This means that some circuits may now require the fitting of an AFDD to protect specifically against arc faults.
2. Requirements for metal cable supports
Currently, regulation states that only wiring systems located in fire escape routes must be supported against premature collapse in the event of fire. This will now apply throughout the entire installation, and wiring systems in all locations will need to have metallic clip supports. Not all clips will need to be metal, however – there just needs to be an adequate number in place, expected to be around 25%.
3. Requirements for RCD protection
With the exception of FELV and RLV sockets, all AC sockets that are rated up to 32A will require RCD protection, as opposed to just 20A. This is a life-saving regulation designed to prevent any electrical shocks to the installer working with live AC socket outlets. It means that electrical contractors will need to pay increased attention to the type of RCD being used, to prevent RCDs being ‘blinded’ by the current waveform.
4. Metallic pipes
Metallic pipes entering a building with an insulating section at their point of entry no longer need to be connected to the protective equipotential bonding
This regulation will require electrical installers to identify whether or not an incoming metallic pipe has an insulating section, to allow them to determine if they must add the protective bonding to the pipe.
5. Energy efficiency
Content relating to energy efficiency, devices for isolation and switching, and onshore units of electrical shore connections for inland navigation vessels has been introduced
Energy efficiency appears in new Appendix 17 in the 18th Edition. This provides recommendations on the design and erection of electrical installations for optimising the overall efficient use of electricity.
To prepare for full compliance with the 18th Edition, electricians can seek a range of AFDDs, varying RCD types (AC, A, B and F), and automation, control, software, and metering and monitoring products for Appendix 17’s energy efficiency application. Other equipment that electricians ought to be sourcing includes metallic cable clips to provide support under fire conditions, and Surge Protection Devices (SPDs) for Section 443 applications. However, the 18th Edition does not just mean that electricians need to invest in new equipment. They will also need to plan and prepare for a revised installation process, potentially putting aside more time to conduct an electrical install. It could also mean that electricians will need to take a more active role in the architectural design process of a building to ensure it will comply with regulations. There is no denying that the movement from the 17th to the 18th Edition will offer a positive step towards creating much safer environments. However, this does mean that the processes electricians have to follow on a daily basis will be significantly altered.
Ultimately, it is the responsibility of electricians to ensure that they have all the equipment in place, with a thorough understanding of the new rules to implement these changes easily and efficiently.
www.schneider-electric.co.uk ‘ 20 BUILDING SERVICES & ENVIRONMENTAL ENGINEER JULY 2018
Adversing: 01622 699116 Editorial: 01354 461430
ARE YOU READY FOR CHANGE? The 18th Edition arrives with a bang
Currently, regulaon states that only wiring systems
located in fire escape routes must be supported against premature collapse in the event of fire. This will now apply throughout the enre installaon, and wiring systems in all locaons will need to have metallic clip supports.
’ VISIT OUR WEBSITE:
www.bsee.co.uk
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50