Stop the press: Providing a process solution for a UK printing company


minimise the line’s downtime and test periods. To combat these logistical challenges, Bosch took a flexible approach and worked closely with other site suppliers in order to achieve a joined-up installation within both time, space and budget constraints. In a project with a completion time of


12 months, the installation and commissioning of the boilers themselves took just two to three months.


A


s one of the UK’s only manufacturers of lithographic printing plate


material – and one of only three producers in Europe – for Bridgnorth Aluminium, producing high quality products efficiently and effectively is paramount. Based in Shropshire, the company has a purpose built, state-of- the-art rolling mill and stretch levelling line, allowing the company to specialise in hot and cold aluminium rolling, annealing and levelling. Following a period of sustained growth for the business, an expansion of its facility led to the installation of two additional hot water boilers as part of its new litho finishing line, with a payback period of just two years.


THE IMPORTANT ELEMENTS For the company’s lithographic material, it is critical that the material’s surface remains unmarked and unblemished when a finishing chemical is applied. To achieve this, a hot degreassant, which is heated using industrial hot water boilers, is applied to the surface, giving the plates a flat surface for printing. As with any new manufacturing process, efficiency in terms of both time and cost was a key consideration. However, coordination, trust and flexibility played a vital role in the successful installation and, following a competitive tender process, Bridgnorth Aluminium opted to work with Bosch Commercial and Industrial.


PROVIDING EFFICIENCY Following the tender process, it was agreed that Bosch Commercial and Industrial would be able to provide not only the products necessary for the expansion but also the support structure needed to cope with the logistical and


24 DECEMBER/JANUARY 2018 | FACTORY EQUIPMENT / FACTORYEQUIPMENT


organisational demands of the project. In order to increase capacity for the


site, while maintaining high efficiency standards, two UNIMAT UT-M 1,400kW hot water boilers were installed to heat a primary circuit, which raises the temperature of both the chemical treatment and hot water rinse. Bosch’s flue gas heat exchanger allows heat from the flue to be returned to the system, saving energy and increasing efficiency by two per cent – an efficiency measure which equates to a saving of up to £18,000 a year. As a result of the flue gas economiser, the company is able to achieve a payback period of just two years.


PLANNING FOR SUCCESS One of the challenging aspects of this installation was the fact that the boilers had to be married up with the rest of the manufacturing line’s creation. For example, to reduce energy-losses, short pipelines were designed as part of the system, which made access to the site difficult. Additionally, the commissioning timings of the different components within the line had to align, in order to


Bosch’s flue gas heat exchanger allows heat from the flue to be returned to the system, saving energy and increasing efficiency by two per cent


THE VERDICT Simon Edwards, mechanical maintenance manager at Bridgnorth Aluminium, comments: “This was a complex project and we needed a hot water boiler supplier that we could discuss all our needs with, which would be on hand post-installation as well as pre. “For us, Bosch was the ideal fit; offering excellent support and a total solution with a flexible product. The team were extremely accommodating and their knowledge on how to approach a problematic situation really shone through. The agreed service contract has proved invaluable to us as the line has become more established and we can be rest assured that any maintenance needs are covered.” Adds Rob Brown, special projects sales


manager at Bosch Commercial and Industrial: “We are delighted we have been able to help a leading UK manufacturer continue to expand and develop. The UNIMAT UT-M hot water boiler was perfectly suited to the site due to its flexibility and energy efficiency.”


Bosch Commercial and Industrial www.bosch-industrial.co.uk T: 0330 123 3004


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73