MEP Concepts Technical Director Ian Pope said: “Bilton Grange


is an excellent example of how using modern methods, and the need to meet today’s expectations and requirements in terms of carbon emissions net zero aspirations, can work within even the most challenging circumstances. “Naturally, the school wanted something in keeping with the


overall appearance and history of the existing site but set out a clear goal for what they wanted to achieve in terms of sustainability. “In our feasibility assessment, a hybrid bivalent solution using


air source heat pumps linked to gas fi red back-up boilers was considered as the most appropriate solution, subject to fi nancial review, but came in over budget and so we reverted to the option of a full air source heat pump (ASHP) solution.” T e use of ASHP coupled to underfl oor heating allowed the


energy performance of the building to be improved without signifi cant design risks. T e developed design, however, retained gas fi red hot water heating as the ASHP solution could not be proven to meet high demand at peak morning load and recharge suffi ciently for the lunchtime and evening demand. T e solution was to split the heating and DHW load between


the technologies. To maintain the building’s projected low carbon emission standards the application of roof mounted PV was added to improve the emissions rating and maintain the A rated EPC. Dave Bowman, MEP Concepts Operations Director, added: “T e


boarding house is home to up to 80 children ranging from seven to thirteen years, so all designs had to be compliant with the specifi c requirements of the school whilst satisfying challenging energy reduction targets. T e system solutions also had to come into an agreed budget. “Our solution introduced a much more carbon-effi cient solu-


tion compared to the standard gas boiler heating solution; using underfl oor heating allowed optimised fl oor area without radiators or convector heaters; and our selection of an external plant area away from the building ensured noise nuisance was not an issue. “T is is an excellent example of a project where the original


design aspirations were achieved, in line with cost and budget constraints, and delivered a highly effi cient building in terms of carbon emissions and energy performance.” MEP Concepts possesses a wealth of knowledge and experience


in the education sector. T e fi rm recently worked with Phil Atkins Estates Director at Bletchley Park Trust, who said: “Having worked with MEP Concepts for over fi ve years for both Mechanical and Electrical Decarbonisation engineering, I would have no hesitation in recommending them. T eir approach has always been helpful and collaborative, and we are looking forward to working with them on the next project at Bletchley Park.” Recent works also include the full M&E building services design


on the Valley SEN School for Ashe Group Ltd. Construction & Technical Director Daniel Ames said: “Ian Pope, Dave Bowman and Adam Alexander have very quickly and successfully integrated into our various project teams. T eir contribution within the fi rst scheme, where timing was an issue, enabled us to procure quickly and still maintain the target of net zero carbon in operation.”


Contact MEP Concepts on 01908 062819, email enquiries@mepconcepts.co.uk or visit the website www.mepconcepts.co.uk


35


EDUCATION


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76