| 77
Eliminating the need for scaffolding not only cuts down on material costs but also accelerates the construction timeline. Builders can begin loading materials onto the floor immediately after installation, potentially saving two to five working days per site. To support its customers, Staircraft offers training sessions and resources that help builders understand the best practices for using all its products. This educational approach not only enhances the customer experience but also ensures that projects are completed efficiently and safely.
WORKING PLATFORM – QUESTIONS AND ANSWERS • What is it made of and how is it made? Working Platform is made from the same I-joists, metal joist hangers and floor decking materials used in conventional floor construction, but the floor is designed to support construction materials being stored on the floor during the building process. Because these temporary construction loads are often higher than those imposed when the dwelling is completed and inhabited, the joists sizes, spacings and metal hanger specification will sometimes need to be uprated over those which would normally be sufficient when the house is lived in. This avoids the need to use scaffolding to temporarily prop the floor during construction, saving scaffolding costs and providing clear access beneath the floor for trades to continue.
• What is its load capacity and how much stronger is it than a normal floor? Floors constructed using the system will typically be 15-30% stronger/stiffer than conventional floors, meaning that the floor
will feel more rigid to homeowners during occupancy.
• How does the overall cost compare with a normal floor?
The enhanced material specifications used in Working Platform floors will typically add between £50-£150 to the material costs of a conventional floor. This will be more than offset by the savings it yields in removing the costs of installing and removing temporary scaffolding, as well as speeding up the build programme.
• What type of loads are applied to floors during construction? Case 1: Blockwork must be loaded out in 450mm x 450mm stacks, on timber pattresses at no less than 1.5m centres and at least 900mm from external walls. Each stack must contain max 14 No. blocks. Case 2: Where block stack loads are applied to the floor via a scaffold system, all scaffold standards must sit on double 38 x 225mm scaffold boards spanning perpendicular to the joists. Case 3: A single stack of plasterboard or chipboard, laid flat, may be loaded out on the floor no further than 1m from external walls, provided it is no higher than 450mm for chipboard or standard plasterboard or 350mm for all other plasterboard types.
The Working Platform exemplifies Staircraft’s dedication to enhancing construction efficiency while addressing industry challenges. As the business continues to innovate and expand, it remains focused on delivering products and services that contribute to the success of its customers and the broader construction community.
SUSTAINABILITY ENGRAINED The business is focused on a number of sustainability improvements involving reducing waste throughout its production processes. By adopting lean manufacturing principles, Staircraft is minimising excess material usage and ensuring that any waste generated is either recycled or repurposed. For instance, offcuts from stair production are made into smaller products or materials, effectively giving them a second life and reducing landfill contributions. This approach not only conserves resources but also enhances operational efficiency. Biomass fuel is also used at its Bayton Road and Ansty factories to provide energy, reducing overall carbon footprint and energy output. In addition to waste reduction, the business is also prioritising energy efficiency in its manufacturing facilities. Investing in machinery and optimising production workflows is significantly lowering energy consumption. This reduces the carbon footprint and results in cost savings, which can be reinvested into further sustainability initiatives and offset some of the recent material price rises.
Sourcing sustainable materials is another active policy and means selecting timber from responsibly managed forests and using eco-friendly finishes that are safe for both the environment and consumers. Ensuring that their materials meet stringent sustainability criteria contributes to the preservation of natural resources. Staircraft has Environmental Product Declarations (EPDs) for all of its products, including stairs, landing balustrades, chipboard floors, and I-joists, to help customers understand and manage their environmental impact. ■
Above left: Case 2 Working Platform construction crash deck Above right: Case 3 Working Platform plasterboard
www.ttjonline.com | May/June 2025 | TTJ
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85