A cracking lesson supply vessel | risk assessment


Case study reprinted with permission of the MAIB


A cracking lesson supply vessel | risk assessment


A supply vessel was in port and loading six containers of cargo in preparation for its next trip out to an offshore rig. Each container held about 7500 litres of liquid nitrogen.


The ship’s crew suspended cargo operations for the night and were awoken early the next morning by a loud bang. The crew mustered on the bridge and saw that ice was forming on the deck beneath one of the nitrogen tanks, indicating a leak from the container (Figure 1).


A supply vessel was in port and loading six containers of cargo in preparation for its next trip out to an offshore rig. Each container held about 7500 litres of liquid nitrogen.


The ship’s crew suspended cargo operations for the night and were awoken early the next morning by a loud bang. The crew mustered on the bridge and saw that ice was forming on the deck beneath one of the nitrogen tanks, indicating a leak from the container (Figure 1).


The crew recognised that they were faced with a hazardous situation and stopped anyone going near the leaking nitrogen or into the spaces in the decks below it. A specialist was called in to conduct tests of the atmosphere to make sure it was safe.


The crew recognised that they were faced with a hazardous situation and stopped anyone going near the leaking nitrogen or into the spaces in the decks below it. A specialist was called in to conduct tests of the atmosphere to make sure it was safe.


The cargo deck was constructed from low carbon steel and, although suitable for shipbuilding, was not designed to withstand the very low temperature of -196°C that the evaporating nitrogen generated.


Steel becomes brittle as its temperature drops and when the deck cargo was removed the crew found that a 4m² area of deck plating and the supporting steelwork had cracked due to their exposure to the low temperature (Figure 2).


The cargo deck was constructed from low carbon steel and, although suitable for shipbuilding, was not designed to withstand the very low temperature of -196°C that the evaporating nitrogen generated.


Steel becomes brittle as its temperature drops and when the deck cargo was removed the crew found that a 4m² area of deck plating and the supporting steelwork had cracked due to their exposure to the low temperature (Figure 2).


A post-incident inspection found that both the main outlet valve and the bleed valve on the nitrogen container, which was not locked, were slightly open and had allowed the nitrogen to leak out through the open bleed valve (Figure 3).


A post-incident inspection found that both the main outlet valve and the bleed valve on the nitrogen container, which was not locked, were slightly open and had allowed the nitrogen to leak out through the open bleed valve (Figure 3).


Figure 1: Icing of deck beneath nitrogen tank container


Figure 1: Icing of deck beneath nitrogen tank container


The Lessons


The Lessons


1. Risk → The carriage of cryogenic gases requires careful consideration of the risks they pose to materials. In this case the simplest hazard control, which was that of keeping the nitrogen in the tank designed to contain it, failed because the valves were unsecured and vulnerable to being knocked open.


2. Action → Once the crew had spotted the leak they made the right decision not to go dashing into areas where the atmosphere could be unsafe. Instead, they properly considered the risks before taking action.


MAIB Safety Digest, April 2023, Merchant Vessels, Case 16 30 | MAIB Safety Digest 1/2023


30 | MAIB Safety Digest 1/2023 99


2. Action → Once the crew had spotted the leak they made the right decision not to go dashing into areas where the atmosphere could be unsafe. Instead, they properly considered the risks before taking action.


IIMS 2023 Safety & Loss Prevention Briefings Compendium


1. Risk → The carriage of cryogenic gases requires careful consideration of the risks they pose to materials. In this case the simplest hazard control, which was that of keeping the nitrogen in the tank designed to contain it, failed because the valves were unsecured and vulnerable to being knocked open.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147  |  Page 148  |  Page 149  |  Page 150  |  Page 151  |  Page 152  |  Page 153  |  Page 154  |  Page 155  |  Page 156  |  Page 157  |  Page 158  |  Page 159  |  Page 160  |  Page 161  |  Page 162  |  Page 163  |  Page 164  |  Page 165  |  Page 166  |  Page 167  |  Page 168  |  Page 169  |  Page 170  |  Page 171  |  Page 172