and the fl oor pieces with a gunstock stain to give some color contrast. T e two other decks were made in a similar way on pieces of 0.6-millimeter veneer subdeck. T ey also had a 0.6-millimeter veneer support strip glued to one edge and then four 4 x
0.6-millimeter strips glued to the edge of each deck. T ese fi nished decks were glued into place forward of the poop deck and on each side if the gangway. (Figure 12)