STEEL FRAMED SPECIALISTS WAREING BUILDINGS EMBARKS ON DIGITALISATION PROCESS WITH ADOPTION OF GROUNDBREAKING TECH
Fifth-generation steel framed manufacturer and contractor, Wareing Buildings, has completed the first phase of a new industry-leading digitalisation strategy, transforming the efficiency of its operations.
Part of a three-year programme of investment into additional buildings, the digitisation initiative augments existing technology and BIM, to provide customers
with real-time information on design, manufacture and dispatch throughout the project delivery process via a single, easy-to-
enable Wareing Buildings to minimise the use of paper drawings and manual tracking, to company’s ethos of advancing its proposition
Since its founding over a century ago, the operates from purpose-built premises at has grown its offering over time from a manufacturer and erecter of steel framed agricultural buildings to supply large its project portfolio includes the ongoing at St Anne’s Pier, restoring the ageing steel
WHITEHILLS BUSINESS PARK
The state-of-the-art technology will also support the business in continuing to deliver complex large-scale commercial projects at the highest standard of excellence. This will enable Wareing Buildings to maintain the outstanding relationships which underpin its success, such as that it has built over many projects with business accommodation provider Henco International.
A DISTINCTIVE LYTHAM RESIDENCE
Leveraging its digital capabilities, Wareing Buildings’ recent technological acquisition proved essential in designing and fabricating steel frames for a modern 13,000 sq ft luxury residence in Lytham, designed by Ben Jurin Architecture.
Appointed by the architect, Wareing Buildings faced challenges unique among residential projects, such as implementing vast steel trusses to support larger-than-normal windows, which windows were equipped for automatic opening and closing, while
Successfully achieving this intrinsic and collaborative working between the Wareing Buildings team, Ben Jurin Architecture Integrating seamlessly with BIM, this technology is unlike traditional analysis software, in that it allows Wareing Buildings’ expert team to create physical, information-rich models with embedded intelligence for full automation allowing the team to
Jason Worledge, an engineer with Wareing Buildings, said: giving all suppliers real-time updates on the building’s progress our technological capabilities is a key component in developing the
For more information on Wareing Buildings and its services, contact via: E:
sales@wareingbuildings.co.uk T: 01772 682 159 W:
www.wareingbuildings.co.uk
LANCASHIREBUSINESSVIEW.CO.UK
Wareing Buildings was appointed to deliver Henco’s latest project: a dual-unit 20,000 sq ft commercial warehouse development at Whitehills Business Park, of which 12,000 sq ft clearance, implementing concrete foundations and strip footings, the fabrication and erection of the steel frame structure and
Park, we have worked in partnership with Henco to develop spaces that will serve to drive forward the commercial sector in
leveraging each phase of our digital transformation journey to turn ensures that our projects progress smoothly and cost-
15
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82