search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
 


RAUTITAN chosen for luxury Edinburgh apartment development


Consultant engineering firm Blackwood Partnership Ltd, were tasked with designing and specifying a development in Edinburgh and needed every aspect of the building to be of the highest quality to match the exacting standards of the apartments’ purchasers. Added to this, all contractors involved along with the developer,AMANewtown Ltd, had to finish the ambitious development within the allotted time schedule. Made up of 15 high-specification luxury apartments and located in a prestigious area surrounded by green spaces,The Pavilion on Kinnear Road in Edinburgh is the latest impressive development fromrenowned developer and was completed in January 2020. In this development the components under the surface, such as heating and water supply systems, had to be just as high specification as the visible aspects.With this in mind Blackwood specified a high quality multilayer composite pipe (MCLP) frompolymer plumbing solutions specialists REHAUto be installed byM&EContractors Platinum (Plumbing Scotland) Ltd.


Detailed design for the highest specification


Throughout the year and a half long design process, Blackwood specified every aspect of the complex downto the fine details,working closely with thehomeowners to create their dreamapartment.The bespoke element of the design process didn’t comewithout its challenges; however, it did ensure the satisfaction of purchasers that theirnewhomewould be exactly to their requirements and high standards. “The detailed design started back in summer 2017 and finished in December 2018,”said AlvaroMarin, Project Engineer at Blackwood Partnership Ltd.“The properties themselveswere being sold throughout the design stage so the purchasers could be involved in design of their apartment, providing a bespoke aspect of the finish of these apartments.


38 drain TRADER | September 2020 | www.draintraderltd.com


“The specification of the kitchens and the bathrooms only came through to us about halfway through the design process.This was quite a challenge becausewe had to design the services around these individual kitchen and bathroomdesigns for each residence in the development. The time-consuming nature of this process meant individual units and fixtures had to be fitted whilst still accessing valves and risers during the construction process, aswell as for future maintenance.To complete the project within the timeframe, a solution that could quickly overcomethese challenges with little disturbance to the design or end result of the developmentwas required.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84