THE MAGAZINE FOR THE DRAINAGE, WATER & WASTEWATER INDUSTRIES


SPECIAL WORKS


and pipe. Quick-Lock Mini


shell and EPDMrubber seal. The stainless-steel shell has a special locking mechanism which is located in a corresponding slot that has teeth cut into it, which acts as a ratchet. The shell is placed over a high-pressure inflatable bladder that runs on wheels. This bladder is pushed or pulled into place along with the Quick-Lock unit, monitored by CCTV equipment. Once in place, the bladder is inflated between 3 and 5 bar locking the shell into place, sandwiching the EPDMseal between the stainless shell and the pipe wall. The Quick-Lock units are available in a range of sizes from DN100 to DN2000 with different installation methods being used for the Quick-Lock Mini and the Quick-Lock Large products.


SITE INSTALLATION


It was decided on this occasion that a series of Quick-Lock units would be installed, each within a pre-liner to


prevent any over expansion due to the size changes within the pipe. This also meant that PBF Drainage could marry the repair up to the upstream section of pipework which had been replaced at an earlier time.


During the cleaning process a small section of subsoil fell into the pipe. This back fill contained stone, rubble and other hard objects which caused issues with the pre-cleaning process but with the use of suction equipment and low- pressure, forward-facing jetting equipment the contractor was able to remove this debris. A single patch repair was installed through the section of pipe where the obvert was missing this prevented further issues with collapse. Once secure and the PBF crews was happy with the pipe, the pre- liner was pulled into position. Once in place the initial Quick-Lock was installed from the down-stream chamber and locked into the pre-liner


The rest of the Quick-Locks were all installed over a single 10 hour shift with a total of 28 separate Quick-Locks being installed on site by a small 3 person crew. Each Quick-Lock was overlapped with its predecessor to make sure there was a good seal and the additional strength that was required. The use of CCTV equipment and pulling the Quick- Lock and packer through the pre-liner by use of rope meant that the work could be completed very quickly and easily, reducing the risk of any further collapse of the pipe. The use of the pre- liner meant that installation through the excavation reduced the requirement to install new pipework which was necessary due to the potential risk of collapsing the existing downstream section. The void between the pipe wall and Quick-Lock repairs was filled using an injection grout that prevented and movement of the repair. Once completed the pipe was back filled correctly and re-instated into service.


The use of Quick-Lock and its mechanical sealing properties meant that there was no curing taking place which would all have added to the time on site and the risk of further collapse. The units’ strength meant that they could withstand the ground pressure and any backfill that was placed onto them.


PBF Drainage expressed thanks to Terry Ingleby and the project client for their trust to get the works done in a timely manner with the minimum of disruption, as well as cost effectively. PBF Drainage Services has developed a reputation across the UK for its high quality, diverse repair methods, working in sizes of 75 mm to 2,200 mm using the latest equipment and materials.


Online. In your pocket. On the App store. draintraderltd.com/magazine


FOLLOW US February 2022 | 27


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80