LIGHTING
EVERYONE ACTIVE
SET TO SAVE With a reliance on complex and power-
intensive systems, leisure centre operators are continually on the lookout to try and reduce
expenditure. Energys explain how they helped one company to optimise use of lighting technology at 145 facilities across the UK.
For a recent upgrade initiative at three council leisure sites operating under the consumer leisure brand Everyone Active, Sports & Leisure Management Ltd (SLM) enlisted the input of leading lighting specialist Energys Group, which is part of its energy management strategy team. In a pattern well-established by previous projects, the Energys team – led by Business Development Manager Raj Gunasekaran – set about researching viable energy-saving solutions in order to determine how much money might be saved over the long-term.
In the wake of a successful deployment of boiler control and valve wrap solutions a few years ago, it was decided that a comprehensive installation of the latest LED- based lighting was the best way to achieve further savings. The new specification was designed by Energys to comply with Sports 4 England criteria, ensuring optimum comfort and efficiency.
The sites will benefit from reduced environmental impact as a
consequence of the new lighting.
“As with a number of other leisure complexes in the recent past, the scheme has made it possible for SLM to implement these hugely-beneficial new LED-based solutions, with positive results both for the overall cost of the operation and the comfort of patrons,” says Gunasekaran.
Across all three sites, the upgraded lighting installations draw on the latest LED products from the Energys Group range. LED tubes, panels, down-lights, hi-bay units with intelligent multi-sensors, spotlights, wall lights, outdoor wall lights, SON replacement lamps and flood-lights all feature in the far-reaching projects. The specification of intelligent auto-sensing lights in sports halls and indoor track spaces at each of the three sites – in order to provide additional savings when un-
32 | TOMORROW’S FM
occupied – was another important aspect of a project that also encompassed indoor stadiums, gym and dance studios, offices, cafes, kitchens and store rooms, among other spaces.
The installations at three leisure centres – Westgate, Bourne and David Weir – were completed in no more than two weeks apiece during December 2016 and January 2017. But whilst the work itself might have been fairly quick, the benefits are destined to be long-lived. For example, the projected energy savings at Westgate are £26,774 and 243400 kWh, with a return on investment (RoI) of just 2.4 years.
The upgraded lighting installations draw on the latest LED products.
Underlining SLM’s commitment to carbon reduction, the sites will also benefit from a reduced environmental impact as a consequence of the new lighting. For example, at Bourne, a CO2
reduction of 58 tonnes per year is
expected, whilst the figure rises to an impressive 180 tonnes per year at David Weir.
Designed to incorporate daylight harvesting (whereby lighting is adjusted according to natural lighting), the new solutions are easily controlled by staff using a tablet that can be pre-programmed to suit requirements for different sports. The end-result has been a dramatic improvement in conditions, says Chichester Contracts Manager Stuart Mills, who oversees the Westgate and Bourne sites.
“The standard of the lighting is so much better now,” he says, highlighting in particular “the greatly enhanced conditions around the poolside, with obvious benefits for health and safety since the lifeguards can now see more easily to the bottom of the pool! Visually the new lights are a nicer, brighter white and it makes such a difference to the spaces.”
www.energysgroup.com twitter.com/TomorrowsFM
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66