FUTURE PERFECT


Altro resins have been used to create a durable feature flooring solution at a hub for hi-tech startups.


A package of Altro resins products has been used to transform a 30-year old building, which was previously part of the Hewlett Packard campus in Bristol, into the University of the West of England (UWE) Future Space. The building is used by Research and Development project teams to nurture start-up companies working in the fields of robotics and smart-controlled machinery and vehicles. The renovation project was completed by BAM Construction.


The timelines for the project were tight, but an added complication was that half the building needed to continue to be occupied by the staff of the Bristol Robotics Laboratory. This meant that noise, dust, vibration and odours had to be kept to a minimum. Lucie Phillips, at WSP Parsons Brinckerhoff architects said: “We felt, as designers, that a standard resin or vinyl floor finish would look bland in such a large space so we started to explore the options of using a feature resin and we are exceptionally happy with the results of the final product.”


A combination of Altro resins products was used to create solutions for areas such as the circulation hub, main


access route from the entrance to the hub, laboratories, workshops and corridors. Products were selected for their UV stability and slip-resistance, flexibility and durability.


The renovation of an old building into a home for such hi-tech industries demanded a significant transformation. Large new sky-lights flooded the central circulation hub with natural daylight, which in-turn greatly increased UV light illuminating the light-coloured quartz floor, so Altro and WSP Parsons Brinkerhoff enhanced colour stability by including clear UV-stable seal coats.


Specialist resin flooring contractor Polydeck Resins Ltd was selected to install the floors, but the project still faced a number of challenges, some of which were not anticipated. The Polydeck team was able to provide ongoing specification guidance to improve the resultant finishes and problem-solving assistance with programming before and during the installation in order to help to bring the project to completion by the required date.


www.altro.co.uk


twitter.com/TContractFloors


OFFICE & WORKPLACE | 23


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64