NUCLEAR POWER
early stage, there are many variants and designs of DEMO that are modelled with whole system design codes: such as ARIES in the USA and PROCESS in Europe.
KEY CONSIDERATIONS IN THE COMMERCIALISATION PROCESS Te questions for commercialisation include: what are the practicalities of fusion power plants? And what are the economics of such devices? First, we must recognise that fusion economics are quite uncertain because useful fusion is yet to be demonstrated and all the current devices are experimental ‘start-of-the art’. Also, there are very few economic studies of fusion power plants. Nevertheless, we can see the main issues of competitiveness. In 2040 and beyond, energy will be zero- carbon and largely renewable. System costs that include the cost of production, distribution and back-up will be in the range £60+/MWh.
Capital costs of DEMO-like power
plant available in the 1940s are high – £8,000/kWe for an nth of a kind (NOAK) power plant (which is similar maturity to Hinkley Point) with costs being dominated by magnet and vessel costs that are about 50% of the total. Costs could be reduced to just less than £6,000/kWe for production of the 10th unit. Energy costs are also high (£150/MWh) even for mature design using this early technology. Why is this? Firstly, power availability
is low because of both the pulsed power mode of operating tokamaks and also the need to shut the system down and replace vessel and blanket components every few years. Secondly, overall power plant efficiency is low because of the low- temperature power cycle. Also, the high power required to drive the plasma and both the magnets and the cooling systems is all reducing the power cycle efficiency.
The large ITER machine is designed to demonstrate that fusion works
The Experimental Advanced Superconducting Tokamak (EAST)
Tere are near-term production engineering ways of reducing cost and longer-term more advanced technologies, available perhaps in the 2050s, 10 years after the first DEMO, that could address the energy cost issues – improved plasma physics allowing steady-state operation and better materials that both permit longer periods between maintenance and higher cycle efficiency. Tese more advanced designs with repeated production of standard units could achieve both competitive capital costs – £4,000/kWe – and energy costs – £70-80/ MWh (with 7% financing). Frustration with the long timescales of fusion and the drive of private investment is behind alternative fusion strategies based on tokamaks. Tese aim to build fusion power plants in the early 2030s by utilising spherical designs – the shape of an apple – and high-temperature superconductors that provide higher magnetic pressures, leading to smaller sizes and hence lower capital costs. ARC from MIT and Commonwealth Fusion, Tokamak Energy and perhaps also Culham with STEP, are examples of these different strategies. However, these will need the same advanced material vessels and blankets as the larger machines to be competitive – technologies that might not be available before 2050.
WHAT HAPPENS NEXT? Te prospects for fusion are exciting,
spurred on by the global need for clean energy, by records being broken in fusion, by the construction of ITER and by the new privately funded projects. Te UK has strong credentials and skills in both fusion physics and systems design, which is making it a hub for fusion.
Te question now is: “Can the UK build the supply chain as well as the technology to become a leader in commercial fusion power by 2040?” Tokamak Energy, General Fusion and UKAEA Culham are all investing hundreds of millions of pounds in new experiments and in planning fusion power plants in the UK. Tese investments speak volumes about the possibility for UK to lead in fusion – as will the higher power fusion burns in JET with a deuterium-tritium mixture, planned for the next few years.
Tony Roulstone established and teaches on the Nuclear Energy Masters programme in the Department of Engineering at the University of Cambridge
www.engineerlive.com 47
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52