search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
ENGINE & TURBINE TECHNOLOGY


Tis begins to explain why pressure energy is “wasted” in J-T valves. Since a J-T valve is a constant enthalpy device, the internal energy of the gas upstream and downstream of the valve must be the same. In a TEG, the values may differ, and the difference represents the work done on the turbine wheel to drive the PM generator. In other words, the conversion of waste-pressure energy into electric power is accomplished by extracting enthalpy from natural gas in the pipeline.


Consider a city gas distribution process in which a pipeline delivers natural gas to a pressure reduction station at 35bar-g and 30°C. Te gas must be reduced to a pressure of 25bar-g before it enters the city gas distribution network. Te operator may use a J-T valve to meet the distribution regulation. In doing so, the gas will be expanded isenthalpically, or with constant enthalpy (h), as shown in Fig. 2.


Alternatively, the gas may be expanded


isentropically, or with constant entropy(s), in a TEG. Tis process is described by Fig. 3. In doing so, it is observed that the specific enthalpy of the expanded gas (at 25bar-g) is lower than the specific enthalpy of the high-pressure gas (at 35bar-g). Te difference in these specific enthalpies may be multiplied by the natural gas mass flow to calculate the amount of power available to spin the PM generator. For this process, the isentropic power is 515kW.


MULTIPLE APPLICATIONS In addition to city gas distribution, TEGs such as the FIT can be used to recover natural gas waste-pressure energy in the upstream (wellheads), midstream (fuel gas for engines and turbines, gas processing plants), and downstream (refinery) industries. Te use of J-T valves is common in oil and gas operations, and each segment of the supply chain has many applications where TEGs can be installed to convert waste-pressure energy into electricity. Te target market for TEGs is


broader than one process gas. For instance, Sapphire is closely monitoring developments in the hydrogen economy, where FIT enables many of the same waste-pressure energy recovery applications listed above. Hydrogen usage is expected to grow over the next 10 years, but high costs of


Fig. 2. Pressure-temperature diagram of J-T expansion


Fig. 3. Pressure-temperature diagram of TEG expansion


production, transportation and storage remain prohibitive, delaying the gas’ widespread adoption as an energy source. By recovering waste-pressure energy throughout new hydrogen infrastructure, TEGs can improve project financials and accelerate the adoption of this energy source.


ENVIRONMENTAL, SOCIAL AND CORPORATE GOVERNANCE (ESG) With ESG initiatives requiring more conscious operations, waste-pressure energy recovery projects represent low-hanging fruit for natural gas distributors. Consider the same city gas


distribution process and assume that the operator flows 50 million standard cubic feet per day (MMSCFD) through a TEG such as the FIT. Sapphire’s FIT system is estimated to produce 410kW of power with an isentropic efficiency of 85%. During continuous operation, FIT will generate 3,595MWh per year and offset 2,555 tonnes of CO2


equivalent emissions.


Jeff Earl is with Sapphire Technologies www.sapphiretechnologies.com


www.engineerlive.com 27


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52