OPERATION & MAINTENANCE OF POWER PLANTS
A
s the global demand for electrical energy continues to grow, more power plants are being built and their designs have to accommodate
the changing requirements of the power generation market. Gas turbine manufacturers have developed larger and more efficient units, which need to be supported by advanced feed water pumps (FWP) to ensure long-term reliability as well as cost-effectiveness. Tere are several ways that operators and manufacturers can work together to optimise performance and reliability. Over the past 20 years, an increasing amount of energy has been delivered by wind and solar installations. Tese renewable sources produce power intermittently which means more traditional facilities, such as combined cycle power stations, now need to have the ability to make up the remaining output to match demand. At the same time, the size of gas turbines has also increased with the advent of the H-class, which can be installed in combined cycle power plants to deliver up to 1,600MW. Designing and building these installations is a major undertaking that requires considerable planning and engineering expertise to ensure a cost- effective and reliable project.
MEETING DEMAND H-class gas turbines have been developed by the four major manufacturers of this equipment to meet the expected growth in demand worldwide. Tis has been combined with the greater generation capacity from renewable sources, to provide a more robust distribution network. In addition, the existing technology of the smaller combined cycle plants is continuing to be installed. As a result, many gas turbines no longer
run continuously, they are brought online as and when demand requires. Tis can
xxxxxxx
Feedwater pump in Sulzer workshop
KEEPING PACE WITH DEMAND
Patrick Welz discusses matching feed water pump designs with advances in gas fired power plants
mean several stop-start cycles every day, which can introduce new challenges for all of the equipment in the power plant. During the initial design phase of the H-class turbine, manufacturers realised the sheer scale of the output as well as the varying demand would require design changes in some of the other equipment. Tey took the opportunity to work with pump manufacturers such as Sulzer on developing optimised pumps in tandem with the work on the turbines. In this way, when the new H-class turbine was ready to be launched, there was also a complete suite of pumps and other equipment that matched the performance demands and could be installed as a complete power generation solution.
Sulzer engineered the first-in-class MD feed water pump, which has been installed in Keadby 2
CASE STUDY: FLEXIBLE, EFFICIENT OPERATION In terms of size, the feed water pumps head the field and are specified to match
the configuration of the power plant. In a one-on-one solution, where one gas turbine is operated with one steam turbine, there would typically be two FWPs in a duty/standby arrangement. In a two-on-one arrangement, there would be three FWPs with two of them operating under normal conditions and one on standby. One of the most recent installations
involving an H-class gas turbine was at Keadby 2, UK, where the 840MW power plant is one of the most efficient in the world. To achieve its class-leading levels of performance, the plant uses a host of advanced technologies, and the UK energy company SSE Termal partnered with major technology providers from across the world to design and build the power plant. While Siemens Energy was designing the
new gas turbine that was to be used in the facility, Sulzer was enhancing its product range to match the increased performance
www.engineerlive.com 13
Image courtesy of Siemens Energy
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52