46 STRUCTURAL ELEMENTS


apply the second coat at 90° to the first. When tiling direct over timber we would recommend installing an uncoupling mat system. Uncoupling mats provide a “buffer” layer between the timber floor and tiled surface which helps prevent any lateral movement from causing any damage to the tiles.


A suitable highly polymer modified flexible tile adhesive and grout should be specified.


Tiling to the correct type of steel can be achieved, if it is rigid and free from deflection and prepared properly


Concrete / sand & cement screeds Before tiling to concrete or sand and cement screeds, it is essential that the floor is clean and free from any barriers to adhesion, sound, dry and fully cured before tiling. New concrete must be cured and allowed to dry in air for at least six weeks before tiling, while new sand and cement screeds need a minimum of three weeks. If you’re tiling onto a screed that incorporates underfloor heating, there are more considerations before fixing can commence. This includes the proper commissioning of the heated screed before and after tiling. After a minimum three week drying out period for the heated screed, water fed systems should be gradually heated at a rate of 5°C per day from the minimum operating temperature up to a maximum operating water temperature of 45°C as recommended by the heating manufacturer. The heating should be maintained at this level for a minimum of three days before cooling to room temperature. In colder temperatures, maintain the floor at 15°C before tiling. If heated screed isn’t gradually ‘commissioned’ before tiling commences, movement stresses exerted can damage the screed and the newly applied tiling layer. This is caused by a combination of significant drying shrinkage of the screed occurring, along with additional thermal expansion/contraction. Electric cable systems keep the heating system off for five days to allow for levellers and adhesives to cure, then gradually turn up by no more than 5°C per day up to a temperature not exceeding 27°C. The heating system should be gradually increased after tiling i.e. 14 days after grouting for normal setting tile adhesives.


Calcium sulphate screeds Calcium sulphate floors are a common floor substrate nowadays, particularly in new builds, however they require specific


WWW.ARCHITECTSDATAFILE.CO.UK


preparation before they are suitable for tiling over.


Under ideal drying conditions, these screeds take approximately 1 mm per day up to 40 mm to dry, and an additional two days per mm for screeds greater than 40 mm, e.g. 60 days for a 50 mm thick screed. However, this can often extend during colder periods of the year and higher atmospheric humidity (e.g. above 65 per cent RH). It is important that all barriers to adhesion should be removed after two to six days. Moisture levels should be less than 75 per cent relative humidity or a residual moisture content of lower than 0.5 per cent water by weight when measured using a carbide moisture tester.


Priming is also key before tiling commences on calcium sulphate screeds, as this creates an effective barrier between the gypsum and cement-based products – protecting against an adverse reaction. The primer should also be adequately absorbed into the screed surface, following the manufacturer’s advice.


If a fast-track system is needed, there are systems on the market including floating uncoupling systems and DPMs which can reduce the time required before tiling commences.


Steel Tiling to the correct type of steel can be achieved, if it is rigid and free from deflection and prepared properly. This might involve a suitable mechanical preparation to remove any surface coatings and to expose a shiny keyed steel surface. To provide a suitable mechanical key to receive a tile adhesive and tile one option is to use a suitable epoxy coating which is sand-blinded as a priming coat. This provides a good key prior to the application of a suitable cement-based tile adhesives or a specialist S2 rubber-crumb tile adhesive.


Waterproofing


Be mindful that if the floor being tiled is likely to be subjected to constant wetting i.e. a wet room or shower/bathroom, then the subfloor should be waterproofed with an appropriate tanking solution. This is to protect the floors from water ingress and prevent porous materials being adversely affected. This is required because tiles, cement-based adhesive and grouts are not inherently waterproof.


Stuart Ross is technical services manager at BAL


ADF JUNE 2021


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84