Activity 6 Prepare a budget
Use the information you gathered during your investigation to draw up a realistic budget for your design. Your budget must include the following: • • •
expected costs of construction costs of materials labour costs.
(5)
Activity 7 Build a working scale model
1 As a team, work together to make a model of your chosen idea. 2 Use readily available material such as drinking straws, cardboard, string, plastic and modelling clay.
3 Remember your model should be built neatly, to scale and be the same type of construction shown in your working drawings.
4 You do not need to make a full size model, but it should be made to scale as were your drawings.
(15)
Communication skills Activity 8 Present your project
1 Once you have compiled your reports, budget, posters, working drawings and model, present your proposal to the Tender Board. All team members must participate in the presentation.
2 Each team member is responsible for presenting an aspect of the project.
During the presentation, the rest of the members of your class will evaluate your presentation.
PAT total: 70 marks
128 Practical Assessment Task
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38