search.noResults

search.searching

note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
Pitchcare Classifieds Golf


New short game area a success at Sandy Lodge


A spectacular new chipping green at Sandy Lodge Golf Club in Northwood is the latest attraction for North West London’s golfers, drawing visitors from across the area


The project to build the 600m2 new green,


adjacent to the club’s existing putting green, was managed by Greg Evans, Master Greenkeeper and golf agronomy consultant.


Featuring a classic links‐style revetted bunker, and an additional sleeper‐style bunker which echoes the monster hazard on Sandy Lodge’s renowned 2nd hole, the chipping green forms a dazzling new frontage to the Sandy Lodge clubhouse.


After meeting with club officials in December 2016 to discuss a long‐term vision for the Sandy Lodge golf course and practice facilities, Greg was commissioned to uplift course conditions and also to restructure the greens team at the club.


In early 2017, Greg began to draw together a talented team to deliver the first phase, the chipping green. Experienced course designer Ricky Willison, golf architects Weller Designs and sports turf contractors Profusion Environmental were all appointed, the latter after a tender process in March 2017.


Construction started in June 2017, with a key role also played by the club’s new Head Greenkeeper, Richard Elderfield, who was promoted to head the in‐house greens team as one of Greg’s restructuring recommendations.


Profusion handled the key construction, irrigation and drainage aspects of the chipping green project, with Richard and his son Michael working alongside Greg on achieving the right growth and turf quality.


By late July 2017, construction was over, followed by an intense growing‐in period leading to a photoshoot in late September, which captured marketing‐friendly images showing the new chipping green in late‐summer splendour.


“The club’s vision has been spectacularly realised


with the new chipping green,” said Greg. “The project came together beautifully at Sandy Lodge, with exceptional work from the club’s own greens staff resulting in an international‐class playing surface. Early feedback has been exceptional, and it is a stunning addition to one of London’s most acclaimed golf clubs.”


“I am looking forward to helping Sandy Lodge progress the next phase of work, as the club raises its standards of conditioning still higher.”


“Greg’s passion for creating great playing surfaces has been amazing to see, and I cannot speak highly enough of him,” said David Scammell, Chairman of Greens at Sandy Lodge. “He brought complete professionalism and integrity to the table and his team‐building skills have greatly motivated our greens team.”


“His ethos is to work with the dominant grass found on your golf course and in making that grass perform to its best. The resulting quality has been stunning, and the new chipping green has been widely praised by members and visitors alike.”


David Griffin, General Manager at Sandy Lodge GC, said: “Greg has inspired change across the


whole golf course in the last nine months. Not only has this helped me to fulfil my role as GM, but Greg’s influence has also given our members and guests an exceptional golf course to play. The chipping green is the new centrepiece of our practice facilities and a true showcase for Sandy Lodge Golf Club. It is already attracting newcomers and is helping us to build for the future.”


See www.gregevansmg.co.uk for more information, or call +44 (0)7951 157208


2018 Sandy Lodge chipping green - technical and design details


• 600m2 • Adjoins and matches existing putting green


• Project management: Greg Evans Golf Course Solutions with Sandy Lodge GC greens team


• Architects: Ricky Willison and Weller Design • Contractors: Profusion Environmental • Full USGA design and standards • Toro Flex 800 Series sprinklers


• Revetted bunker with Buckbricks sand. Sleeper bunker with Redhill sand


• Chipping green laid using ‘poa cores’ method, after hollow‐coring all greens on the 18‐hole course. Cores were then laid out on the newly‐created surface, ensuring that the new chipping green features the club’s indigenous grass in keeping with the rest of the course ‐ thus guaranteeing a representative practice experience


• Chipping green surrounds turfed with Tillers Fescue/Rye mix


• 12‐week growing‐in period managed in‐ house by Michael Elderfield in an intense feeding, watering, cutting and top dressing process


150 I PC APRIL/MAY 2018


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147  |  Page 148  |  Page 149  |  Page 150  |  Page 151  |  Page 152  |  Page 153  |  Page 154  |  Page 155  |  Page 156  |  Page 157  |  Page 158  |  Page 159  |  Page 160  |  Page 161  |  Page 162  |  Page 163  |  Page 164