Must contain the following elements in any order LIFTS
Maximum of two • Lifts can be selected from Groups 1-4 and must be different • Variations of the lady’s position, no-handed and one-handed lifts, combination lifts, lifts that include a carry feature, carry lifts and lifts that turn in both directions are not permitted; however, the release of the lady’s hands in a Group 1 lift and the release of the lady’s hands after the lift extension has been achieved in a platter lift are not violations of this rule. • 0LQLPXP RI RQH DQG PD[LPXP RI ò UHYROXWLRQV E\ WKH PDQ
TWIST LIFT
THROW JUMP SOLO JUMP
JUMP
COMBINATION/ SEQUENCE
SOLO SPIN
Maximum of one single • 7DNH RII PXVW EH ÀLS RU /XW]
Maximum of two (single or double) • Must be different
Maximum of one (single or double)
Maximum of one (single or double jumps only) • Maximum of two jumps in the jump combination • 1XPEHU RI MXPSV LQ WKH MXPS VHTXHQFH LV XQOLPLWHG
Maximum of one • Can be solo spin or solo spin combination • 0D\ EHJLQ ZLWK D À\LQJ HQWU\ • Change of foot and change of position are optional • 0XVW KDYH D PLQLPXP RI ¿YH UHYROXWLRQV E\ ERWK SDUWQHUV • Both partners must achieve a basic position for at least two revolutions
DEATH SPIRAL / PIVOT FIGURE
CHOREOGRAPHIC SEQUENCE
REMARKS
0D[LPXP RI RQH GHDWK VSLUDO RU SLYRW ¿JXUH • 5HJXODU KDQG WR KDQG KROG UHTXLUHG • ,Q WKH ¿QDO SRVLWLRQ ZKLOH WKH ODG\ LV SHUIRUPLQJ WKH DFWXDO GHDWK VSLUDO RU SLYRW ¿JXUH ERWK WKH man and the lady must execute a minimum of one-half revolution with the knees of the man clearly bent and in full pivot position
Maximum of one • Must be clearly visible
• Unless otherwise stated, all elements must meet the general criteria and basic requirements in order to be counted (see rule section 5100).
• If an extra jump(s) element is executed, only the individual jump(s) which is not according to the requirements will have no value. The jumps are considered in the order of execution.