CASE STUDIES
e-Series to the rescue for Contour Homes
When Contour Homes was looking for a new chiller due to ongoing problems with its old one, Preston based GOS Mechanical & Electrical Ltd recommended the installation of three Mitsubishi Electric EAHV- P900YA-N e-series heat pump chillers to provide a low-carbon, cost- effective option for the Housing Association.
C
ontour Homes, part of the Symphony Housing Group, is one of Manchester’s largest registered social landlords with over 12,000 properties under its ownership and management across 23 local authorities. The Housing Association provides a wide range of services from a number of local offices throughout the North West. Its main office, based on Christie Way, West Didsbury, once belonged to leading pharmaceutical firm AstraZeneca. It
comprises offices and meeting rooms and is staffed during office hours.
“Our chiller had failed and we had been trying to get it replaced for a number of years due to complaints from staff,” explained Rob Brierley, Gas Technical Surveyor at Contour Homes. “The offices often overheated during the summer and it wasn’t a good working environment.” The existing chiller system eventually failed in September 2017, so when funds became available a new chiller system was a high priority. As well as the efficiency benefits of the new system, there were other factors to be taken in to account before the new chillers could be installed. One problem with the old system was the level of noise it created. Employers have a duty of care to ensure their workers are not exposed to excessive noise. Prolonged exposure to noise can lead to gradual hearing loss, so a much quieter system was sought for this project. By utilising highly efficient components within a uniquely shaped chiller, the e-series offers low noise levels.
Cooling is one of the main contributors to energy usage in buildings, so Contour Homes’ new system had to be energy efficient to help the building comply with modern efficiency requirements, such as the
60 August 2018
Minimum Energy Performance Standard, which came into force on 1st April 2018. Another potential issue was the fact the existing plant space is extremely tight, making access to the area very difficult. Interruption to office opening hours and staff activity also had to be kept to a minimum.
Preston based GOS Mechanical & Electrical Ltd has years of experience in providing mechanical, plumbing and boiler services throughout Preston and Lancashire. They completed the installation between October 2017 and December 2017. Peter Jackson, Managing Director at GOS Mechanical & Electrical Ltd, believes the choice of chiller played a key role in ensuring a straightforward installation. He said: “The e-series chiller was a sensible choice as it was available immediately. The only concern we had was the tight working space, but the flexibility of Mitsubishi Electric’s modular approach meant it could be easily manoeuvred into position.” The e-series’ unique modular approach allows up to six individual units to be connected together to provide a system capacity from 90kW to 540kW. Using this modular approach reduces space requirements and simplifies lifting and installation.
The e-series modular chiller has two inverter driven compressors that allow the unit to operate between 8% - 100% of capacity. By having a broad operating range the e-series has exceptional part load efficiencies which is where most systems will operate.
Contour Homes is delighted with the new system, which provides the office building with a cooling capacity of 270kW as Rob Brierley concludes: “Mitsubishi Electric has provided us with a modern, reliable and energy efficient chiller that I’m sure will prove to be a great investment in the long term.”
www.acr-news.com
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72