CASE STUDIES


Air intake screens boost malt house refrigeration effi ciency


E


astern Counties Refrigeration (ECR) recommended that Ecex Air Intake Screens be fi tted to four large condensers at Boortmalt’s malting plant in Bury St Edmunds, Suff olk, to prevent clogging and improve their performance.


The Ecex Air Intake Screens have solved the problems of inadequate heat rejection and insuffi cient process cooling during hot weather and other periods of high demand due to debris previously building up on the condensers. Grain from the malt house’s production process, airborne pollen, insects, leaves and other detritus was being drawn onto the coils, clogging


them within just a few weeks of cleaning and meaning the condensers were working well below peak effi ciency.


Repeated pressure washing of the coils was costly, time-consuming and potentially damaging to the delicate coil fi ns.


ECR, a partner of leading multi-specialist engineering contractor Ecex, suggested mounting the heavy-duty commercial grade Air Intake Screens to stop debris blocking the condensers and they were were manufactured and installed promptly by Ecex engineers.


The screens, which come with a 10-year warranty, are ideal for installation on coils, air


handling units, cooling towers, louvres and other HVAC equipment, and can be hosed or brushed clean in minutes. They off er a fast return on investment because they signifi cantly reduce maintenance costs, downtime, wear on plant and energy use as well as improving productivity.


A delighted Johan Abbink, managing director of ECR, said: “We had great communication with Ecex and they were thoroughly professional throughout the contract. I’ve also had really good feedback from my customer. The Ecex guys were neat and tidy, and the job was completed as they said it would be on time and to budget.”


www.acr-news.com August 2018 59


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72