4.5 Summary 81.


The site selection process for the East Anglia THREE site and offshore cable corridor was an iterative process involving the initial zone selection undertaken by The Crown Estate and then the ZAP process conducted by EAOW. Both of these processes involved consultation with a range of stakeholders and the collation of existing and site specific data in order to refine broad areas of search into the boundaries for the proposed East Anglia THREE project.


82.


For the onshore electrical transmission works (i.e. landfall, onshore cable route and indicative convertor station location) the site selection process was undertaken on the basis of the agreed National Grid connection at Bramford for 3.6GW and the intention that the East Anglia THREE onshore cable route would follow that identified during the East Anglia ONE project. . With the exception of the potential new access locations, each part of the site selection and refinement process has been consulted on to date, and feedback from this process has been instrumental in determining the final areas included for the onshore electrical transmission works. With regard to the potential new access locations, the PEI consultation provides an opportunity for stakeholders to review these locations and provide feedback on them to EATL.


Preliminary Environmental Information May 2014


East Anglia THREE Offshore Windfarm


Chapter 4 Site Selection and Alternatives Page 19


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24