Impact


Worst case parameter for assessment


Rationale


being placed on that location. By assessing the two impacts (Construction impact 1 and Operation impact 1) separately all possible impacts will be quantified although there would be a degree of “double counting”. This is a precautionary approach but ensures a comprehensive assessment.


Impact 2: Increased Suspended Sediment Concentrations (SSCs) and Sediment Re-deposition


The worst case scenario would involve the maximum amount of sediment disturbance including:


1. Sea bed preparation of 40m diameter gravity base foundations calculated as 17,500m3 per foundation (see Chapter 7 Marine Geology, Oceanography and physical processes Table 7.4). Therefore for 174 foundations (see Rationale column) the maximum expected amount sediment released into the water column is 3,045,000m3.


2. Sea bed preparation for up to six 60m diameter gravity base foundations (see rationale) would result in a maximum sediment release into the water column of 156,000m3


3.


Installation of up to 550km inter-array cables and 195km HVAC export cables between collector and converter station. Therefore the maximum expected amount of disturbed sediment (with worst case trench of up to 10m wide and 5m depth) is 37,250,000m3. However, only a small amount of this would be become suspended.


The total sediment released into the water column during construction within the East Anglia THREE site by foundation preparation would be up to 3,201,000m3 with a maximum of 37,250,000m3 of sediment disturbed (some of which would be released into the water column) by cable installation.


The installation of cables and foundations would be spread across 2.5


Preliminary Environmental Information May 2014


East Anglia THREE Offshore Windfarm


Chapter 11 Fish and Shellfish Page 13


Only the smallest wind turbines (7MW) would be installed on 40m diameter gravity base foundations and therefore the worst case would be 172 wind turbine foundations, It has been assumed that the two meteorological masts would be installed on foundations which, if gravity base, would require similar sea bed preparation no greater than that of the 40m diameter foundations.


It has been assumed that the worst case for up to: five foundations for converter and collector stations, and one accommodation platform would result in a similar amount of sea bed preparation as that for the largest wind turbine foundation considered for East Anglia THREE which is a 60m diameter foundation (see Chapter 7 Marine Geology, Oceanography and physical processes Table 7.4)


Should the installation of jackets or tripods using pin piles be required, drilling may also be undertaken which would release subsurface materials into the water column.


Should the installation of jackets or tripods using pin piles be required, drilling may also be undertaken which would release subsurface materials into the water column.


Sub-surface sediments have a different physical composition to near-surface sediments and may therefore


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111