partitioning, such as jumbo stud or block walling, which may chip or break if damaged, or when cut. Junctions and penetrations of ISD- designed firewall packages are sealed securely, using approved materials that fully meet all clients’ fire protection requirements. Approved to LPS 1500 and LPS 1531, this is one of the most complete packages on the market today.


Optimal design Crucial aspects for service engineers in data centre applications are fire compartmentation, cooling and ventilation plus resilience relating to security. It’s important to work closely with architects, main contractors and datacentre operators from the conception of a project and during construction. A close working relationship is crucial to ensure optimal design solutions that provide the specified fire protection, area segregation. Coordination for creating and sealing the building services through different zones is important and panels with inbuilt resilience to help prevent unauthorised entry are recommended.


“Composite panel construction better satisfies WRAP and BREEAM targets.”


Fire and sound-proofing Many datacentres incorporate fire suppression to ensure there are no critical losses due to fire. The most innovative fire protection products recognised by the fire authorities and insurance companies are built around the latest steel-faced composite panels with non-combustible mineral fibre cores: basically an advanced, reliable walling system that fully protects complete premises and their contents. The panels also have inbuilt acoustic properties to help minimise sound pollution.


Selecting the right contractor is crucial. The critical nature of datacentre projects frequently require "approved specialist contractor" status, extensive industry experience, LPS 1500 accreditation and certificate of conformity. The right contractor must also demonstrate financial stability, the correct levels of insurance and absolute commitment to the successful completion and confidentiality of the project.


www.isd-solutions.co.uk twitter.com/TomorrowsEM DATA CENTRE MANAGEMENT | 33


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48