search.noResults

search.searching

note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
ROOFING, CLADDING & INSULATION SHOWCASE


45


Hotter shoes start off on the right foot with moisture mapping


in Skelmersdale, West Lancashire had exceeded its serviceable life and begun experiencing significant water ingress, requiring urgent remedial work. Prior to any work commencing on site,


T


Bauder undertook a comprehensive condition and moisture mapping survey of the roof area to help identify the exact extent and locations of water ingress, so that a fully informed decision could then be made to best suit the client’s needs. As a result, the optimal solution was for approved contractor BBR Roofing to strip off the existing deteriorated and delaminating, oxidised bituminous capping sheet and overlay the underlayer with 12,500m2


of Bauder’s high quality, two layer


bituminous system Bauderflex. This partial strip allowed for a quick and undisruptive installation, which was important to the client as they wanted the factory below to


he waterproofing on the roof of footwear manufacturer Hotter Shoes’ head office and manufacturing facility


structural glazed units being expertly fitted to give essential daylight to the building’s interior. Moreover, asbestos was found within the redundant vent apertures and therefore required specialist disposal. Because the factory workers have variable


remain fully operational throughout. One of the major challenges for this project


was the quantity of intricate detailing requirements, which is understandable given the sheer scale of the roof. As part of the necessary works redundant vents and associ- ated frameworks also needed to be removed and replaced prior to new cladding being added to the perimeter and 69 of Bauder’s


Timber Cladding - the natural choice


Canjaere timber cladding from the A. Proctor Group has been supplied for an exciting new housing development for property developer Eskdale Homes. Each of the houses at the Ballenlochan development in Pitlochry were built using Val-U-Therm®


, a unique closed


panel, factory insulated timber frame system with class leading thermal performance and


manufactured off-site by Scotframe Timber Engineering. Canjaere Classic Timber Cladding in the golden natural colourway, Tongue and Groove finish was chosen for its high quality and natural appearance.


01250 872261 www.proctorgroup.com Kingspan enters the space age


When it came to insulating building services at the new Science & Technology Facilities Council RAL Space Development and Test facility (R100) in Didcot, it didn’t take a rocket scientist to see that the fibre-free cores of Kingspan Kooltherm FM Duct and Pipe Insulation made them the outstanding choice.


Over 10,000km of Kingspan Kooltherm FM Duct and Pipe Insulation were specified for the numerous runs of service pipe and ductwork. The products’ fibre-free insulation cores allow them to deliver outstanding energy performance.


01544 388 888 www.kingspaninsulation.co.uk


With many years of experience in the commercial and domestic markets, Rooflight Architectural can manufacture and supply, lantern lights, pitched glazing and walk-on rooflights to any size or specification. We offer technical advice, CAD drawings and nationwide installation.


• Any size • Any colour • Electric or manual vents • Many glazing options • Structural aluminium sections www.rooflight.co.uk


T: 0191 273 7738 F: 01670 738080


sales@rooflight.co.uk


standard and bespoke architectural rooflights and roof glazing


shift patterns it meant that the roofing works programme had to be regularly changed and all deliveries needed to be timed as not to conflict with vehicles moving in and out of the facility. However, despite the logistical challenges encountered all works were completed on time and to budget much to the delight of the client. Upon completion an additional moisture mapping survey was performed to confirm to the client that the overlay was performing as specified and the roof was now completely watertight. To learn more about Bauder’s flat


roof technical diagnostic methods visit the website.


01473 257671 www.bauder.co.uk


ADF MAY 2017


WWW.ARCHITECTSDATAFILE.CO.UK


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84