Kemperol membranes put Piccadilly Gate’s roofs back on track
These roofs of one of Manchester’s most iconic office buildings have been refurbished with an overlay of Kemperol liquid membranes from Kemper System.
Piccadilly Gate is home to various Government departments including Education, Ofsted and Highways England.
The 125,000sqft building adjacent to Manchester Piccadilly Station was refurbished in a £25 million BREEAM ‘Excellent’ scheme in 2010. Issues with the integrity of the roof had continually plagued the building with leaks, resulting in unsightly staining to the suspended ceilings within. Consequently, the decision was taken to overlay the existing single ply roofing membranes on levels 10, 4 and 3 with a cold-applied liquid system from Kemper System.
Roofing contractor, Castle Roofing, was appointed to carry out the works and selected Kemper System’s solvent-free Kemperol 2K-PUR as the most appropriate solution for the level 10 roof.
Explains Mark Atherton from Castle Roofing: “The level 10 roof is directly above occupied office areas and is also the location for the building’s air handling plant, so nuisance odours could potentially have been transferred into the office areas.
“As a result, we chose to use Kemper System’s 2K-PUR system, which is solvent-free and odourless, while still offering high performance and a BBA-accredited 25-year service life.”
The level 4 roof is above the building’s record-breaking extra-long escalators and leaks from two water outlets had caused staining of the
suspended ceiling. This roof was also refurbished as an overlay system, using Kemper System’s Kemperol V210.
Having cleared and prepared the existing roof surface, Castle Contractors applied a primer before applying the resin in a single wet-on-wet process in which the resin is first applied to the susbstrate; reinforcement fleece is then laid directly on to the wet resin, immediately followed by more resin on top.
This ensures complete satisfaction of the reinforcement fleece. Once cured, the resin forms a seamless, elastomeric waterproof membrane that cannot delaminate, is UV stable and bonds directly to the substrate.
For the green roof on level 3, Castle Roofing carried out the refurbishment in two sections, removing half the green roof medium and installing Kemperol V210 onto the existing surface as an overlay before replacing it and lifting the second section so that the new roofing membrane could be installed. The second section was then re-instated, completing the programme.
Comments Jim Fozzard, Building Manager at Piccadilly Gate: “We needed a roofing system that could be installed quickly to prevent any further damage to the building’s interior, while minimising any disruption to occupiers and maintaining Piccadilly Gate’s high aesthetic standards.
“Using Kemperol 2K-PUR on the level 10 roof meant that occupiers were not affected by any changes to air quality, while all three roofs have been overlaid using a seamless membrane without the use of hot works for a durable solution requiring no strip out.”
KEMPER SYSTEM
TEL: 01925 445532 51
WWW.KEMPERSYSTEM.CO.UK
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64