INDUSTRY NEWS
BARRYROE OIL FIELD: RESERVOIR ANALYSIS UPDATE
Providence Resources P.l.c., the Irish oil and gas exploration and development company, have announced a further update on its Barryroe oil field in the North Celtic Sea Basin, offshore Ireland. Providence (80%) operates Barryroe on behalf of its partner Lansdowne Oil and Gas plc (20%). The area is located in Standard Exploration Licence (SEL) 1/11 and Licensing Option (LO) 12/4, situated in c. 100 m water depth and is c. 50 km off the south coast of Ireland.
Providence has recently undertaken static and dynamic modelling of the main Basal Wealden oil bearing reservoir interval. This work incorporated the data from all five Basal Wealden reservoir penetrations, together with maps derived from the recent 3D seismic survey. This study has established oil recovery factors which range from 17% to 43%. Based on a development scenario involving 41 horizontal production and 22 horizontal water-injection wells over a 25 year field life, a recovery factor of 31% is modelled.
These horizontal producer and injector wells are designed to be 600m in length, with the producers incorporating gas lift.
Providence have also announced that the Barryroe Concept Development Engineering Study contract has been awarded to Procyon Oil & Gas. This study will evaluate a number of preferred development options which were high-graded during the recently completed development screening study. John O’Sullivan Technical Director of Providence said; “These reservoir and dynamic modelling studies have identified significant productive potential in the Basal Wealden reservoir, which is consistent with the test and other data that we have previously announced. These results will now be factored into our ongoing field pre- development work where we have kicked off a key engineering study to identify and select the optimum development concept. As part of this study, we will obviously consult and solicit feedback from both regulatory and local stakeholders on an ongoing basis.”
CAPTURING THE TRUE VALUE OF SKILLS
How often do we hear phrases like ‘our people are our best asset’ or ‘an organisation is only as good as the people behind it’?
Read the article on pages 52-53
Official Partner of the Marussia F1™ Team Configurable Lean Manufacturing - CLean Manufacturing With Bifold you can submit bespoke bids faster and with greater clarity, obtain immediate 3D images and offer your clients reduced lead times.
Bifold has developed interactive 3D configuration software and manufacturing systems to create instantaneous custom designs including 3D CAD models, 2D drafts, part numbers and descriptions and BOMs.
Deliver 316L stainless steel products within 1 week Produce scale 3D printed prototype models in 1 day View scale 3D augmented reality in 1 minute
Download the free Bifold Valve World App and view CLean Manufacturing at the show.
→
Scan To View Our App Page
Download our FREE App from our App landing page on:
bifold.co.uk/Apps/ValveWorld available for download, from mid November 2012.
Available to take away from the show, will be a postcard containing a tracking image which works alongside your App.
Free App Safety and Performance
For more information Bifold, Greenside Way, Middleton Manchester, M24 1SW, UK Tel: +44 (0)161 345 4777 Fax: +44 (0)161 345 4780 Email:
marketing@bifold.co.uk
Web:
www.bifold.co.uk
→ Augmented Reality
Various viewing platforms, including iPad, iPhone and Android devices.
Visit us at Valve World Expo, Dusseldorf, 27th - 29th November 2012, Stand No. 3/A72 Hall 03.
www.bifold.co.uk
Bifold App advert Oil and Gas Connect Magazine Edition6 Nov 2012 Issue .indd 1
WWW.THECONNECTSERIES.CO.UK
21/09/2012 15:22:45 Oil&GasCONNECT 17
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116